60m3 Price of Boom Concrete Mixer Pump
USD $5,000 - $55,000 /Set
Min.Order:1 Set
Zhengzhou Qiangli Machinery Manufacture Co., Ltd.
60m3 Price of Boom Concrete Mixer Pump
1. Technical parameter
Item | Unit | Parameter | ||
Concrete pump | Max. theoretic concrete delivery volume | m³/h | 60 | |
Max. theoretic delivery pressure | MPa | 12.5 | ||
Max. delivery frequency | times/min | 22 | ||
Type of distribution valve |
| S tube valve | ||
Main oil cylinder specification: cylinder dia./role dia.× stroke | mm | Φ125/Φ80×1650 | ||
Concrete cylinder specification | mm | Φ200 | ||
Hopper capacity | L | 600 | ||
Output opening diameter | mm | Φ150 | ||
Discharging height | mm | 1400 | ||
Power system | Rated power of diesel engine | Kw | 118 | |
Revolution | r/min | 2300 | ||
Fuel consumption |
| 218g/kwh | ||
Hydralic system | Type of Hydraulic oil circuit |
| Open circuit | |
Maximum oil pressure of main system | MPa | 32 | ||
Maximum oil pressure of mixing system | MPa | 14 | ||
Max. mixing speed | r/min | 24 | ||
Hydraulic oil tank volume | L | 420 | ||
Other parameters | High and low pressure switch |
| Equipped | |
Procedure-control electric lubricating system |
| Equipped | ||
Allowable max. aggregate diameter | mm | Pebble 50, crushed stone 40 | ||
Inner diameter of concrete delivery pipe | mm | Φ125 | ||
Max. delivery distance | horizontal | 700m | ||
vertical | 180m | |||
Dimension (length*width*height) | In transit | mm | 6600×1930×2190 | |
Weight | Kg | 5500 | ||
2. Configuration
1. Power: LOVOL Diesel engine
2. Main oil pump: Handok
3. Seal parts: American Parker
4. Main electric parts: original Schneider, Omron or LG electric components
5. Manual pressure switch: equipped
6. Pipe joints: American Eaton
7.150 mDelivery pipeline, spare parts and tools
Container
One 40’GP container can hold 1 set of pump
NOTICE:
We keep on optimizing our products, so the specification and material are subject to change without notice.
Payment
30% prepayment on signing the contract and 70% balance before shipment.
Delivery time
Within 30 days for the standard pump after receipt of prepayment.
Installment
The equipment should be installed in flat places. We will arrange the technician to install and test the equipment, and train operation personnel for free. The traveling expense, board and lodging expenses should be assumed by the customer.
Quality and service
The concrete pump is manufactured according to national standard GB/T13333-91, which can be used for your check.
Guarantee time
12 months after the machine leaves factory