Diesel Type 80m3 Concrete Pump Spare Parts Delivery Elbows
USD $5,000 - $55,000 /Set
Min.Order:1 Set
Zhengzhou Qiangli Machinery Manufacture Co., Ltd.
Diesel Type 80m3 Concrete Pump Spare Parts Delivery Elbows
1. Technical parameter
| Parameter | Unit | HBTS80-16-162R |
Overall performance | Max. Theoretical Concrete Conveying Capacity | M³/h | 88 |
Max. Concrete Pumping Pressure Mpa | Mpa | 16 | |
The form of Distribution valve |
| S pipe valve | |
Concrete Conveying Cylinder Spec.(bore*stroke) | mm | 200*1,800 | |
Hopper Capacity | M3 | 0.68 | |
Diameter of Pump exit | mm | 180 | |
Hopper Height | mm | 1450 | |
Power | Motor Brand |
| Weichai |
Motor Power | Kw | 162 | |
Rated Speed | r/min | 2,200 | |
Minimum speed | r/min | 600 | |
Engine cooling mode |
| water-cooled diesel engine | |
Maximumtorque | n/m | 843/1,400r.p.m | |
Hydraulic System | Hydraulic oil tank mode |
| open circuit |
Oil pumping system | MPa | 32 | |
Oil Tank Capacity | L | 580 | |
Fuel tank capacity | L | 250 | |
Overall Dimension(L*W*H)) | mm | 6750*2160*2700 | |
Total Weight | Kg | 7.6T |
2. Configuration
Using situation of concrete pump
It has been wildly used in many projects such as high buildings, municipal construction, tunnel, culverts, electricity, power, traffic and so on.
Detail of concrete pump
1.PLC system to ensure best control performance
2.With re-pumping function to smooth construction of better accessibility
3.Equipped with wired remote controller, easy to operate
4.German Rexroth, Japanese Kawasaki series main oil pumps
5.Italy Hydraulic Hose
6.French Schneider, Japanese MITSUBISHI, PANASONIC electric elements
Container
One 20’GP container can hold 1 set of pump
1)we have CE,ISO certificate;
2)we have 20-year experience;
3)we have over 100 workers to ensure quick delivery;
4)we have 20 engineers to design special concrete plants for our customers;
5)we have after sales service like: installation, debugging, operator training and spare parts supply.
NOTICE:
We keep on optimizing our products, so the specification and material are subject to change without notice.
Payment
30% prepayment on signing the contract and 70% balance before shipment.
Delivery time
Within 30 days for the standard pump after receipt of prepayment.
Installment
The equipment should be installed in flat places. We will arrange the technician to install and test the equipment, and train operation personnel for free. The traveling expense, board and lodging expenses should be assumed by the customer.
Quality and service
The concrete pump is manufactured according to national standard GB/T13333-91, which can be used for your check.
Guarantee time
12 months after the machine leaves factory