ALUMINUM WELDING MACHINE AC DCTIG 250
USD $290 - $320 /Piece
Min.Order:5 Pieces
Taian E.S.K. International Co., Ltd.
AC/DC Inverter TIG Welding machine
Features:
1. ac dc tig welding,especial for aluminum material welding
2. Quality square wave power supply, short current zero-crossing time,stable arc
3. Super cleaning ability of oxide film,continuosly adjustable cleaning width, bright and beautiful weld seam ,Especialy adapted to weld aluminum,magnesium and its alloy materials.
4. Comprehensive protection function of over voltage, low voltage, over current ,over heat .safe and relible
5. Easy to start arc, stable welding current, quick dynamic response, focused arc,AC welding without bias and beautiful welding forming.
6. panel with remote control interface, optional to be equipped with foot switch.
item | wse-250 |
power voltage(V)(1PH) | 220±15%AC,single -phase |
Frequency(HZ) | 50/60 |
Rated input current (A) | 22 |
Output current (A) | 10-250 |
Efficiency | 0.80 |
Duty cycle % | 60 |
No load Voltage(V) | 56 |
Rated duty voltage (V) | 20 |
Preheat time(s) | 0-2 |
Delay time (s) | 2-10 |
Attenuated time (s) | 0-5 |
Arc initiation way | HF |
Max current(A) | 250 |
Power factor | 0.73 |
Protection degree | IP21S |
Insulation class | F |
Measurement(mm) | 600*440*415 |
Weight(kg) | 23 |
Cod.(NO.) | 892034 |
Accessories of TIG series | ||||
1.TIG torch | 1pc | |||
2.earth clamp with cable | 1pc | |||
tection mask | 1pc | |||
4.brush+chippping hammer | 1pc |
Q: what is warranty time ?
A: 12 months from you got the cargo.
During warranty time, we will supply the free parts by air in free,
after that date, we will supply spare parts in the base of part cost
Q: what is delivery time / lead time ?
A: 30 days
Q: what is your minimum order ?
A: 5 pcs
Q: what is your payment term ?
A: 1- 30% down payment for order confirmation, 70% before shipment.
2- Trade assurance
optional foot pedal
Q: what is warranty time ?
A: 12 months from you got the cargo.
During warranty time, we will supply the free parts by air in free,
after that date, we will supply spare parts in the base of part cost
Q: what is delivery time / lead time ?
A: 30 days
Q: what is your minimum order ?
A: 5 pcs
Q: what is your payment term ?
A: 1- 30% down payment for order confirmation, 70% before shipment.
2- Trade assurance
Q: can we visit your factory ?
A: yes you can at your free time.