AIR PLASMA INVERTER CUTTING MACHINE CUT-100
USD $525 - $550 /Piece
Min.Order:5 Pieces
Taian E.S.K. International Co., Ltd.
DC INVERTER PLASMA CUTTER
Features
• Inverter IGBT technique makes the welder more strong to do the bigger workpiece.
• It adopts advanced inverter technology,can adjust the current freely,high efficiency.
• Compact,light and protable,suitable for moving and working.
• It’s perfect for cutting of stainless steel,carbon steel,aluminum, copperxompQsite plate and etc...Smooth kerf and high precision.
Item | CUT-80I | CUT-100I | CUT-120 |
Power voltage(V)(3PH) | 380±15%AC,Three-phase | 380±15%AC,Three-phase | 220±15%AC,Single-phase |
Max input power(KVA) | 11 | 15 | 19 |
Frequency(HZ) | 50/60 | 50/60 | 50/60 |
Efficiency | 0.85 | 0.85 | 0.85 |
Max No load Voltage(V) | 270 | 270 | 270 |
Current range(A) | 20-80 | 20-100 | 20-120 |
Max current(A) | 80 | 100 | 120 |
Rated duty cycle(%) | 60% | 60% | 60% |
Max.Cutting thickness(MM) | 30 | 35 | 40 |
Protection degree | IP21S | IP21S | IP21S |
Insulation class | H | H | H |
Measurement(CM) | 46 X 33 X 32 | 50 X 37 X 35 | 50 X 37 X 35 |
Weight(KG) | 32 | 36 | 38 |
Cod.(NO) | 20110284 | 20110285 | 20110286 |
Accessories of CUT series | |
1.cutting torch | 1pc |
2.earth clamp | 1pc |
3. protection mask | 1pc |
4. brush | 1pc |
5.gas regulator | 1pc |
nnector | 1pc |
7.chipping hammer | 1pc |
8.ground cable | 1.2meters |
packing: cartons
Q: what is warranty time ?
A: 12 months from you got the cargo.
During warranty time, we will supply the free parts by air in free,
after that date, we will supply spare parts in the base of part cost .
Q: what is delivery time / lead time ?
A: 30 days
Q: what is your minimum order ?
A: 5 pcs
Q: what is your payment term ?
A: 1- 30% down payment for order confirmation, 70% before shipment.
2- Trade assurance
Q: can we visit your factory ?
Q: what is warranty time ?
A: 12 months from you got the cargo.
During warranty time, we will supply the free parts by air in free,
after that date, we will supply spare parts in the base of part cost .
Q: what is delivery time / lead time ?
A: 30 days
Q: what is your minimum order ?
A: 5 pcs
Q: what is your payment term ?
A: 1- 30% down payment for order confirmation, 70% before shipment.
2- Trade assurance
Q: can we visit your factory ?
A: yes you can at your free time.