HGY-300 prospect drill rig machine
Negotiable /Set
Min.Order:1 Set
Hunan Flydisc New Material Co., Ltd.
HGY-300 Drilling Rig
It is widely used in the construction of the projects e.g. prospecting, railway, road, port, bridge, water conservancy and hydropower, tunnel, well, industrial and civil construction, geological exploration, large diameter boring pile and small diameter diamond core deep hole drilling, etc.
Brief introduction:
1.32 years professional manufacture
2. Certificate: ISO9001:2008
3. Export to: Africa, the Middle East, South America, Asia,
Countries: South Africa, Zambia, Sudan, Iran, South Korea, Costa Rica etc.
Features:
1) Wide range of suitable rotary speed to meet various needs.
2) Common auto parts, such as clutch, transmission case and shifting structure.
Application:
1. Coal mining exploration, Ore exploration;
2. Small hole diameter water well drilling;
3. Geothermal pipe-installing for heat pump;
4. Small-diameter hole foundation piling drilling
Technological Data of Drilling Rigs:
Model | HGY-300 Drilling Rig |
Drilling depth( m) | 300 |
Drilling rod diameter.(mm) | Φ50 |
Head angle range | 0~360° |
Movable cylinder stroke (mm) | 400 |
Spindle speed( r/min) | Positive rotation rate:50 87 137 189 230 399 629 868 Reverse rotation rate: 39 180 |
Spindle hole diameter( mm) | Φ63/Φ95 |
Spindle output torque max(N.M) | 2800 |
Spindle stroke(mm) | 530 |
Lifting power max( KN) | 60 |
Driving force max(KN) | 40 |
Lifting speed( m/s) | 0.41 0.72 1.13 1.6 |
Lifting capacity(single) max(KN) | 30 |
Steel wire rope diameter (mm) | Φ13 |
Mode of chuck | hydraulic chuck or pillar-type chuck |
Weight(power unit excepted)(Kg) | 1200 |
Overall dimensions(mm) | 2315*900*1700 |
Diesel engine model | K4100D(30KW) |
Electromotor model | Y180L-4( 22KW) |
Our company has produced drilling equipments for 50 years. We have passed ISO9001:2008, TS16949, CE Certification, MA Certification, High-tech Enterprise Certification.
The rigs are widely used in the construction of the projects e. g. prospecting, railway, road, port, bridge, water conservancy and hydropower, tunnel, well, industrial and civil construction, geological exploration, large diameter boring pile and small diameter diamond core deep hole drilling, etc. The main products are engineering geological drilling rig;water well drilling rig; vertical shaft 100, 200, 300, 650, 1000, 1500m rigs, full hydraulic power head 1000, 2000m rigs. At the same time, we produce drill bits and drill tools matching with the drilling rigs. Many rigs and drill bits possess patent certificates. Our products have exported to many countries of world. Such as Nepal, India, SriLanka, Afghanistan, Malaysia, Iran, Sudan, Chile etc.
Our Factory | our team of foreign trade | In 1992,100m drill in Antarctica in the world | Go to driiing site to train drilling knowledge |
Q:Rig using common sense?
Answer:
(1) class maintenance:
The outer surface of the drill is wiped clean, and pay attention to the rig substructure slideway, vertical surface cleaning and good lubrication.
The examination of all open bolt, nut, insurance and other solid and reliable.
According to the lubrication requirements of the lubricating oil or grease, see Figure two and table a.
The check gearbox, gear box and the hydraulic system the location of oil tank.
The check around the oil leakage and as the condition to be treated.
The elimination in the class occurred within the other fault.
(2) peripheral maintenance:
The complete class maintenance programs required.
The removal of chuck and slips on the tooth surface dirt, mud.
The clean the inner surface of the brake oil, mud.
The excluded from this week 's fault.
(3) month maintenance:
The complete class, weekly maintenance programs required.
The disconnect chuck, cleaning slips and slips seat. Should be replaced if damaged.
The cleaning tank filter, replacement of deterioration or soiled by hydraulic oil.
The examination of the major components of the intact state, should be replaced if damaged, can not be wounded the work.
The complete elimination of the fault occurred in the month.
And if the drill does not use for a long time, the display part (especially the processing table. ) should becoated with grease.