HGY-2000 spindle wire-line geological core prospecting drilling rig machine
Negotiable /Set
Min.Order:1 Set
Hunan Flydisc New Material Co., Ltd.
Features:
1) Rang of rotation speed is wide and reasonable
2) The lowest speed is 49r/min,so the torque is over than 10KN.M,it’s easy to remove the drillnig accessories and deal with the accident
3)The cluth adopts hydraulic operation
4)The transmission case adopts automobile gearbox with high quality
5)The transfer case adopts synchroniser structure.
6)With good stability,guarantee machining precision.
Use: for geotechnical investigation, exploring, prospecting, water well drilling;
Widely used in the construction of the projects e.g. prospection, railway, road, port, bridge, water conservancy and hydropower, tunnel, well, industrial and civil construction, geological exploring, large diameter boring pile and small diameter diamond core deep hole drilling, etc.
Model | HGY-2000 Drilling Rig |
Drilling depth(m) | 2000 |
Maximum speed spindle(r/min) | 1143 |
Spindle speed(r/min) | Positive rotation rate:(speed is1480r/min)51,73,111,123,157,195,265,290,395,421,530,626,852,1143 Reverse rotation rate:58,124 |
Spindle stroke(mm) | 900 |
Spindle lifting power max.(KN) | 200 |
Spindle driving force max.(KN) | 150 |
Spindle output torque max.(N.M) | (Power is75kw)9767N.m |
Spindle hole diameter(mm) | Φ118 |
Lifting speed(m/s) | 0.44, 0.6, 1.05, 1.66, 2.48, 3.37, 4.52 |
Lifting capacity(single)max.(KN) | 100 |
Steel wire rope diameter & lenth(mm) | Φ22×120 |
Movable cylinder stroke(mm) | 600±10 |
Oil pump type | 2CB-FE-31-5/31-5EF-L11-3L |
Oil pump nominal displacement(ml/r) | 50 |
Oil pump nominal pressure(Mpa) | 20 |
Oil pump nominal rotative velocity(r/min) | 1800 |
Electric motor type | Y280S-4 |
Electric motor power(kw) | 75 |
Electric motor speed(r/min) | 1480 |
Diesel engine type | 4BT3.9-C125 |
Diesel engine power(kw) | 93 |
Diesel engine speed(r/min) | 2200 |
Weight(power unit excepted(kg)) | 5000 |
Overall size(L*W*H) (mm) | 3700*1270*2500 |
Drill tools for geolgocial core prospecting drilling
Q:Rig using common sense?
Answer:
(1) class maintenance:
The outer surface of the drill is wiped clean, and pay attention to the rig substructure slideway, vertical surface cleaning and good lubrication.
The examination of all open bolt, nut, insurance and other solid and reliable.
According to the lubrication requirements of the lubricating oil or grease, see Figure two and table a.
The check gearbox, gear box and the hydraulic system the location of oil tank.
The check around the oil leakage and as the condition to be treated.
The elimination in the class occurred within the other fault.
(2) peripheral maintenance:
The complete class maintenance programs required.
The removal of chuck and slips on the tooth surface dirt, mud.
The clean the inner surface of the brake oil, mud.
The excluded from this week 's fault.
(3) month maintenance:
The complete class, weekly maintenance programs required.
The disconnect chuck, cleaning slips and slips seat. Should be replaced if damaged.
The cleaning tank filter, replacement of deterioration or soiled by hydraulic oil.
The examination of the major components of the intact state, should be replaced if damaged, can not be wounded the work.
The complete elimination of the fault occurred in the month.
And if the drill does not use for a long time, the display part (especially the processing table. ) should becoated with grease.