HGY-1500 wire-line borehole drilling machine for sale
HGY-1500 wire-line borehole drilling machine for sale
HGY-1500 wire-line borehole drilling machine for sale
HGY-1500 wire-line borehole drilling machine for sale

HGY-1500 wire-line borehole drilling machine for sale

Negotiable /Piece

Min.Order:1 Piece

Supply Ability:
60 Set / Sets per Month
Port:
guangzhou/shenzhen/ shanghai
Payment Terms:
T/T

Quick Details View All >

Condition:
New
Type:
Other, Rotary Drilling Rig, small, spindle ,mini ,deep,HGY-1500, 1500m
Power Type:
Other, Diesel engine or electromotor
Place of Origin:
Hunan, China
Brand Name:
Flydisc
Model Number:
HGY-1500

Hunan Flydisc New Material Co., Ltd.

Business Type: Manufacturer,Trading Company
Changsha Hunan China
Main Products: Drilling Rig ,Drill Bit ,Core Drilling Rig ,Diamond Drill Bit ,Rotary Core Drilling Rig

Product Details

Specifications

Drilling Rig
Max depth 1200-1500m
Wide range of suitable rotary speed
Utility patent
Full hydraulic chuck

HGY-1500  Drilling Rig

This machine is widely used in construction work such as exploration, railway, highway, port, bridge, hydropower, tunnel, water well, building, engineering geological prospecting, heavy caliber drilled pile and minor-caliber diamond core drilling.

  

Features of HGY-1500 Drilling Rig

1) Wide range of suitable rotary speed to meet various needs.

2) Adopted from the 'jiefang"CA151 auto parts, such as clutch and gear-Box.

3) Reasonable design of the transmission and shift on the principle of bevel gear.

4) A good grip with the disk spring on the Chuck.

5) Convenient to lift up and down the tower, all the work are performed by the hydraulic system.

 

 Technological Data of HGY-1500 Drilling Rig

     Model

 Drilling Rig(HGY-1500)

Drilling depth( m)

1500~1200

Rod diameter( mm)

Φ42~Φ50

Spindle speed( r/min)

  Positive rotation rate: 54 86 145 219 310 378 415 570 808 1081

Reverse rotation rate: 58 152

Spindle stroke(mm)

600

Lifting power max( KN)

80

Driving force max(KN)

60

Spindle output torque max(N.M)

7150

Spindle hole diameter( mm)

Φ95

Cable diameter(mm)

17.5

Drum circumferential velocity( 9 layers)

45

Lifting speed( m/s)

0.51 0.81 1.37 2.06 2.92 3.91

Lifting capacity(single) max(KN)

40

Movable cylinder stroke (mm)

400

Gear oil pump model

2CB-FA32/10-FL

Nominal displacement( ml/r)

40

Nominal pressure( MPa)

14

 Electromotor model

Y225S-­4 or Y225M-4 

 Power( kw)

 37 or 45

 Speed( r/min)

1480

Diesel engine model

4110-125

Power( kw)

81

 Speed( r/min)

2800

Diesel engine weght(Kg)

385

Overall dimensions(mm)

2460*1150*1888

 Weight(power unit excepted)(Kg)

4100

 Head angle range

0~90

Diesel engine model

4110-125

Tower load(t)

                             10

Tower height(m)

                             9.5

Tower pedestal(m)

                            4*4.5

 

Production

 

Packaging & Shipping

 

FAQ

Q:Rig using common sense?

Answer:

(1) class maintenance:

The outer surface of the drill is wiped clean, and pay attention to the rig substructure slideway, vertical surface cleaning and good lubrication.


The examination of all open bolt, nut, insurance and other solid and reliable.
According to the lubrication requirements of the lubricating oil or grease, see Figure two and table a.
The check gearbox, gear box and the hydraulic system the location of oil tank.
The check around the oil leakage and as the condition to be treated.
The elimination in the class occurred within the other fault.

 

(2) peripheral maintenance:
The complete class maintenance programs required.
The removal of chuck and slips on the tooth surface dirt, mud.
The clean the inner surface of the brake oil, mud.
The excluded from this week 's fault.

 

(3) month maintenance:
The complete class, weekly maintenance programs required.
The disconnect chuck, cleaning slips and slips seat. Should be replaced if damaged.
The cleaning tank filter, replacement of deterioration or soiled by hydraulic oil.
The examination of the major components of the intact state, should be replaced if damaged, can not be wounded the work.
The complete elimination of the fault occurred in the month.
And if the drill does not use for a long time, the display part (especially the processing table. ) should becoated with grease.

 

How to install

How to install this rig? How to operate this rig?

Don't worry,  buy our products, we will give you professional guidance.

 

We have produced drilling equipments for more than 50 years.

We are a Professional manufacturer.

 

If this rig is right for you,don't  hesitate to contact us immediately.

If not, it does't matter, email to us and tell us which rig do you want, we will reply to you immediately respond to you  and  recommended right drilling rig for you.

 

Don't hesitate, email to us now. You will get unexpected results !

 

 

 

 

Contact Supplier

Ms. Jenny Zhan Director Chat Now
Telephone
0086-731-85560714
Mobile
0086 13667322872
Fax
0086-731-85560764
Address
No.232 SHU GUANG MIDDLE ROAD Changsha,Hunan

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Energy & Mineral Equipment > Mining Machinery > Mine Drilling Rig
Categories
Hi~