China manufacturer Gas generator set biomass gasifier generator
USD $8,453 - $298,015 /Set
Min.Order:1 Set
Shandong Dragon New Energy Co., Ltd.
CHP Power Plant 300KW Biomass Gas Generator with low heat consumption
Jichai/Shengdong Gas/Diesel Generator Fast Moving Parts, oil filter fuel filter air filter
all kind of JICHAI 190 series Accessories of Generator Set oil filter starter
all kind of JICHAI 190 series Diesel/Gas Generator Spares, Gas Piston
CE ISO 20-500KW biomass gas generator
1.Our advantage:
1)manufacturer for10 years
2)Adopting advanced control system, the gas engine will be more reliable, and easier to start.
3) Burn methane(green energy) with low emission and environment friendly.
4) Several gas generators can be paralleled together , which can increase the total power range.
5)In addition,the gensets can take maintenance in different times,which will make little influence to the normal
performance of gensets.
2.Gas Requirements For Biomass Gas Genset
1m distance away from genset’s pressure regulating valve of inlet
Gas temperature≤40℃;
Gas pressure 5~20kPa, pressure changing rate≤ 1kPa/min;
H2S≤200mg/Nm3;
NH3≤20mg/Nm3;
Coke tar content≤20mg/Nm3;
Impurities particle size≤5μm; impurity content≤30mg/Nm3;
Moisture Content of biomass ≤40g/Nm3;
gas calorific value≥4.2MJ/Nm3.
Purification of biomass gas have a significant impact on machine life and continuous running time
3. Worksite requirements for generator
a) Ambient temperature between -40ºC~45ºC;
b) Relative humidity less than 90%(35ºC);
c) Site elevation not higher than 2000m;
d) For outdoor installation, simple rain shelter is required.
4.Parameters
Model Number (Engine Type) | LHBMG120 |
Brand Name | LVHUAN |
Prime Power/Standby Power | 96KW/120KW |
Rated Speed | 1500/1800RPM |
Rated Frequency | 50/60Hz |
Rated Voltage | 400V/230V |
Phase | AC 3-Phase, 4 wire |
Voltage Stability | ≤±2% |
Voltage transient | ≤±10% |
Voltage Stable time | ≤1s |
Heat consumption | ≤11mj/kw.h |
Lubricant consumption | ≤1.0g/kw.h |
Engine Capacity | 25.80 L |
Cylinder Number | 12 |
Cylinder Bore | 135mm |
Stroke | 150mm |
Starting System | DC 24V electric motor |
Cooling method | water cooler |
Lubricant method | Passive and flying lubricant |
Isolation class | H |
Protection | IP23 |
Alternator | Chinese Stamford |
Power Factor | 0.8 lagging |
Exciting method | brushless |
Colour | your choice |
Certificates | ISO 9001:2008, CE |
Warranty | 1 year or 1000 running hours which arrives first |
Type | Open |
Control system | Automatic alarm system |
Size | 3200x1350x1750mm |
Weight | 2900kg |
(Single set power supply range: 10 - 600 kw, ≥2 sets parallel together to form large power, Eg. 500kw*3 sets = 1500KW)
5.Equipment
6.Case
7.Visitor
8.Service
1.pre-sale service:
(1)We will send our engineer to prospect the site of power station free to charge.
(2)According to the situation of site we can supply you many drawings:like power station floor plan,engineering flow sheet of circle cooling system,genset installation,genset foundation,electrical connection and some other techincal support etc.
2.Sale service:
(1)we will send our engineer to the site to guide you the installation of generator set, subsystem and relative equipment.
(2)We will debug the generator set till it can generate power successfully.
(3)We will also supply a technical training to the operators.Orcan send your staff to our company.We can train you till you can operate the generator set.
3.After-sale service:
(1)Our every engineers are in charge of different area,we will response periodically and support you technical service free of charge,
(2)For the quality problem, we will service for you free of charge during the guarantee period.
(3)One year guarantee period and lifetime service.
(4)we solve quality problem in time when genset doesn’t work,We insure to help our clients to gain the biggest economic profit.
9.FAQ
1.How to choose the right model?
A: It depends on real output power, Voltage, Frequency and gas type.
2.What is the oil consumption and capacity per hour?
A: 1.0-1.63g of lubricant oil consumption per hour. 1.0 Cubic meter gas can produce 1.5-3.0kw/h power. The capacity depends on gas energy. E.g 1.0 Cubic meter natural gas produce about 3.0kw/h
3.What is the overhaul?
A: About 30000 working hours. A week is enough to finish.
4. What is the warranty?
A: 1 year. Inside this 1 year, we offer all spare parts free of charge. After this period, spare parts are not free. But, a set of spare parts will be shipped together with machine free.
5. How is the service?
A: We offer installation,repair and maintain service abroad. And online guide service if needed anytime. Our before-sale, in-sale and after-sale service are all trustable, you can name it.
Please feel free to ask question and quotation.