Product Details

Non-curable rubber asphalt waterproof material waterproof coating

CAS No. N/M
Other Names rubber paint
MF N/A
EINECS No. N/M
Place of Origin Shandong, China
Main Raw Material Other, rubber and bitumen
Usage Building Coating, Plastic Coating, Road Marking Paint, Rubber Coating, Other, Building Coating, Plastic Coating, Road Marking Paint, Rubber Coating, Building coating, waterproof wall paint
Application Method Brush
State Liquid Coating
Brand Name Kunteng
Model Number CLU

Product Features

Non-curable rubber

  Non-curable rubber asphalt waterproof material waterproof coating

The material is one component waterproof  coating that made by  powder, polymer, asphalt and other materials 

through special modifier and annexing agent.After long-term exposure to air,non-cured rubberized asphalt  

waterproof coating don’t curing,insoluble in water, have high bond strength, able to adapt to the complex construction operation;it can automatically Search for leaks parts repair damaged the waterproof layer,to keep permanent leak proof;

doesn’t contain solvents, meet the requirements of national security, environmental protection.It has outstanding creep properties, good waterproof performance, ageing resistance, can usedaub, spraying and plasma, and other methods.It can use with coil to form composite waterproof layer;and can also be alone as a waterproof layer, surface should be attached to the isolation layer.

 

 

Characteristic:

 

1. Excellent creep properties

 

2. Excellent bonding performance

 

3. Excellent self-healing property

 

4. Excellent wet construction at the grass-roots level

 

5. Excellent resistance to chemical corrosion resistance and aging resistance

 

6. Superior environmental performance 

 

 

Application:

 

1.industrial and civil building roof and side wall waterproof engineering

 

2.planting roof waterproof engineering

 

3.underground structures, subway station, tunnel waterproof engineering

 

4.road bridges, railways and other waterproof engineering

 

5.dams, water conservancy facilities and other waterproof engineering

 

6.deformation cracks, settlement joint and other crack grouting filling and sewing

Non-curable rubber asphalt waterproof material waterproof coating

Non-curable rubber asphalt waterproof material waterproof coating

 

Construction points :

 

1.Clean up the grass-roots

 

When the surface of the grass-roots level obviously uneven is suitable to  use cement mortar screding;  Through the

pipeline of the waterproof layer, embedded parts and equipment foundation shall be buried before the waterproof layer

construction and installation.The gaps between the pipeline and structure should plugging tightly of fine stone concrete or polymer waterproof mortar.Use a broom or hair drier to clean up grass-roots mortar and construction  waste.

Acceptance of the basic level should smooth,  solid, drainage slope comply with the design requirements, grass-roots

 level can be wet but can  not have  water on the surface.

 

2.Detail parts additional layer construction

 

The place such as roof rainwater mouth, the roof tube root, the inside and exposed corner of parapet and gutter firstly blade coating 1mm non-cured rubberized asphalt waterproof coating to make strengthen. 

 

3.Coating construction

 

Coating can choose blade coating or spray coating construction, open extrusion pump, to squeeze noncured rubberized 

asphalt waterproof coating to the grass-roots, blade coating evenly and full coating not exposed base,coating thickness 

according to the Design requirements.

 

4.Pave coil

 

Then paving the coiled material to waterproof coating surface that has completed the construction , it should laid straight, smooth, no wrinkle.Coiled material lap width is 100 mm,overlapping parts adopt cold stick form, then blade coating or spray coating non-cured rubberized asphalt waterproof coating on the coil lap width range, no need  table dry time, can

be directly construction overlapping parts of the coil, and rolling.

 

5.water-storing test

 

After the completion of the waterproof layer, water storage experiment was carried out in accordance with the regulations

 

Storage 24 hours no leakage water is qualified. 

 

6.The construction of protective layer

 

The quality of roof waterproof layer can be qualified acceptanceprotective layer construction can be going.According to

 

design requirements do the corresponding concrete, block material or cement mortar layer.

 

Transportation and storage :

 

 To save the material in a dry indoor ventilation

 

To prevent the sun and rain and avoid collision in transportation

 

The shelf life of product is half a year, exceed the shelf life should re-inspection when qualified can be used

 

 

 

 

company information

 

Why choose us?

 

1,Honest supplier to the worldwide buyers

 

2,Factory, direct supplier, competitive price

 

3,Know how to control the costing with 10 years producing experience

 

4,Warm and friendly service and guide

 

5,3 shifts workers for 24hrs production, high capacity

 

6,Small and big orders are welcome from the worldwide

 

7, 24 hours service for you 

 

Website:

 

 Honest is our business policy, quality and service first. The key of the successful activity in the high quality of research and controls before, during and after production.

 
Non-curable rubber asphalt waterproof material waterproof coating

 

 

 

FAQ

 With high quality and competive price. You deserve to have! Contact us Now~

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now