Non-cured rubber asphalt waterproof coating/paint
USD $1.5 - $6 /Kilogram
Min.Order:500 Kilograms
Weifang Choice-Link Trading Co., Ltd.
Non-cured rubber asphalt waterproof coating/paint
The material is one component waterproof coating that made by powder, polymer, asphalt and other materials
through special modifier and annexing agent.After long-term exposure to air,non-cured rubberized asphalt
waterproof coating don’t curing,insoluble in water, have high bond strength, able to adapt to the complex construction operation;it can automatically Search for leaks parts repair damaged the waterproof layer,to keep permanent leak proof;
doesn’t contain solvents, meet the requirements of national security, environmental protection.It has outstanding creep properties, good waterproof performance, ageing resistance, can usedaub, spraying and plasma, and other methods.It can use with coil to form composite waterproof layer;and can also be alone as a waterproof layer, surface should be attached to the isolation layer.
Characteristic:
1. Excellent creep properties
2. Excellent bonding performance
3. Excellent self-healing property
4. Excellent wet construction at the grass-roots level
5. Excellent resistance to chemical corrosion resistance and aging resistance
6. Superior environmental performance
Application:
1.industrial and civil building roof and side wall waterproof engineering
2.planting roof waterproof engineering
3.underground structures, subway station, tunnel waterproof engineering
4.road bridges, railways and other waterproof engineering
5.dams, water conservancy facilities and other waterproof engineering
6.deformation cracks, settlement joint and other crack grouting filling and sewing
Construction points :
1.Clean up the grass-roots
When the surface of the grass-roots level obviously uneven is suitable to use cement mortar screding; Through the
pipeline of the waterproof layer, embedded parts and equipment foundation shall be buried before the waterproof layer
construction and installation.The gaps between the pipeline and structure should plugging tightly of fine stone concrete or polymer waterproof mortar.Use a broom or hair drier to clean up grass-roots mortar and construction waste.
Acceptance of the basic level should smooth, solid, drainage slope comply with the design requirements, grass-roots
level can be wet but can not have water on the surface.
2.Detail parts additional layer construction
The place such as roof rainwater mouth, the roof tube root, the inside and exposed corner of parapet and gutter firstly blade coating 1mm non-cured rubberized asphalt waterproof coating to make strengthen.
3.Coating construction
Coating can choose blade coating or spray coating construction, open extrusion pump, to squeeze noncured rubberized
asphalt waterproof coating to the grass-roots, blade coating evenly and full coating not exposed base,coating thickness
according to the Design requirements.
4.Pave coil
Then paving the coiled material to waterproof coating surface that has completed the construction , it should laid straight, smooth, no wrinkle.Coiled material lap width is 100 mm,overlapping parts adopt cold stick form, then blade coating or spray coating non-cured rubberized asphalt waterproof coating on the coil lap width range, no need table dry time, can
be directly construction overlapping parts of the coil, and rolling.
5.water-storing test
After the completion of the waterproof layer, water storage experiment was carried out in accordance with the regulations
Storage 24 hours no leakage water is qualified.
6.The construction of protective layer
The quality of roof waterproof layer can be qualified acceptance, protective layer construction can be going.According to
design requirements do the corresponding concrete, block material or cement mortar layer.
Transportation and storage :
To save the material in a dry indoor ventilation
To prevent the sun and rain and avoid collision in transportation
The shelf life of product is half a year, exceed the shelf life should re-inspection when qualified can be used
Why choose us?
1,Honest supplier to the worldwide buyers
2,Factory, direct supplier, competitive price
3,Know how to control the costing with 10 years producing experience
4,Warm and friendly service and guide
5,3 shifts workers for 24hrs production, high capacity
6,Small and big orders are welcome from the worldwide
7, 24 hours service for you
Website:
Honest is our business policy, quality and service first. The key of the successful activity in the high quality of research and controls before, during and after production.
With high quality and competive price. You deserve to have! Contact us Now~