wicker pool lounger
USD $10 - $1,000 /Set
Min.Order:10 Sets
Dongguan Smart Furniture Co., Ltd.
wicker pool lounger
Specification about wicker pool lounger:
1.aluminum frame, tube thickness is 1.5mm, strong enough for wicker pool lounger
2.8cm cushion is avalible for wicker pool lounger
3. wicker pool lounger is UV-resistant and waterproof
4,wicker pool lounger can be approved outdoor furniture, stackable rattan sun wicker pool lounger
More details about wicker pool lounger:
Brand
| Description | Size | mterial | color | Qty/40'HQ |
SMART
| outdoor beach wicker pool lounger | 204X66X99/35CM standrad size | aluminum frame, pe rattan | optional | 190 |
Material for wicker pool lounger:
1. aluminum frame with powder coated finishing: well jointing make the frame sturdy, polished legs for wicker pool lounger
2. SGS tested PE wicker/ rattan, UV-resistant & more durable when it comes to comparing with some cheaper wicker, the latter corrosioned easily under water and UV
3. using polyester fabric, middle-high denstiy foam, proper softness in wicker pool lounger which can give you a nice feeling
4. aluminum or steel is changeable; aluminum is lighter, steel is a little cheaper and heavier. both good choice, it is up to customers' choice.
5. colors is optional for wicker pool lounger
Packing Details
1. we pack the wicker pool lounger legs & arms with craft paper or bubble bag for protection
2. peal cotton as second layer package in wicker pool lounger.
3. craft paper as third layer.
4. we use plastic film as last layer to tight the wicker pool lounger
5. PE bags for cushions and pillows to prevent dirty for wicker pool lounger
6. carton is available for wicker pool lounger packing.
7. we wrap fittings seperately and tightly to prevent it losing and spilling in the package of wicker pool lounger.
In a word, safe and export standard packing methord. Additionally, welcome customers'
packing requests.
Delivery time for wicker pool lounger
1. it takes 30 days for a small order(eg. 20GP); 35 days more than 1X40'HQ
2. busy season usually need 40-50 days; 30-35 days in off season