rocking sun lounger
USD $10 - $1,000 /Set
Min.Order:10 Sets
Dongguan Smart Furniture Co., Ltd.
rocking sun lounger
Specification about rocking sun lounger:
1.aluminum frame, tube thickness is 1.5mm, strong enough for rocking sun lounger
2.8cm cushion is avalible for rocking sun lounger
3. rocking sun lounger is UV-resistant and waterproof
4,rocking sun lounger can be approved outdoor furniture, stackable rattan sun rocking sun lounger
More details about rocking sun lounger:
Brand
| Description | Size | mterial | color | Qty/40'HQ |
SMART
| outdoor beach rocking sun lounger | 204X66X99/35CM standrad size | aluminum frame, pe rattan | optional | 190 |
Material for rocking sun lounger:
1. aluminum frame with powder coated finishing: well jointing make the frame sturdy, polished legs for rocking sun lounger
2. SGS tested PE wicker/ rattan, UV-resistant & more durable when it comes to comparing with some cheaper wicker, the latter corrosioned easily under water and UV
3. using polyester fabric, middle-high denstiy foam, proper softness in rocking sun lounger which can give you a nice feeling
4. aluminum or steel is changeable; aluminum is lighter, steel is a little cheaper and heavier. both good choice, it is up to customers' choice.
5. colors is optional for rocking sun lounger
Packing Details
1. we pack the rocking sun lounger legs & arms with craft paper or bubble bag for protection
2. peal cotton as second layer package in rocking sun lounger.
3. craft paper as third layer.
4. we use plastic film as last layer to tight the rocking sun lounger
5. PE bags for cushions and pillows to prevent dirty for rocking sun lounger
6. carton is available for rocking sun lounger packing.
7. we wrap fittings seperately and tightly to prevent it losing and spilling in the package of rocking sun lounger.
In a word, safe and export standard packing methord. Additionally, welcome customers'
packing requests.
Delivery time for rocking sun lounger
1. it takes 30 days for a small order(eg. 20GP); 35 days more than 1X40'HQ
2. busy season usually need 40-50 days; 30-35 days in off season