Steel frame curtain wall profile production line
Steel frame curtain wall profile production line
Steel frame curtain wall profile production line
Steel frame curtain wall profile production line

Steel frame curtain wall profile production line

USD $50,000 - $300,000 /Set

Min.Order:1 Set

Supply Ability:
10 Set / Sets per Month
Port:
Nanjing
Payment Terms:
T/T

Quick Details View All >

Condition:
New
Type:
Other, Roll Forming Machine
Pipe Material:
Carbon Steel
Application:
Other, doorcase/doorframe
Place of Origin:
Jiangsu, China
Brand Name:
Zhongqing

Nanjing Zhongqing Machine Making Co., Ltd.

Business Type: Manufacturer,Trading Company
Nanjing Jiangsu China
Main Products: pipe welding line ,cold roll forming line ,cut-to-length-slitting saw ,steel pipe packing machine

Product Details

Cold bending profile production line

 

Equipment technological process:

Scroller car--uncoil—pinch leveling--transverse shear – centering guide device—circle shear—waste edge coil—accumulator—dension device—recoiling machine—unloading car—electrnic control system—hydraulic system

 

We welcome you to visit our factory, you will find your trip is worthy

 

 

       Steel frame curtain wall profile production line

 

 

LW250 Parameters:

Specification

LW250×2.0   LW400

Max. Width

250 mm

Max. Thickness

1.0~3.0mm

Materials

Q235,Q345B

Welding Speed:

10~35M/Min

 

 Forming unit:

Technical data

LW400

Strip thickness

1.5~3.5mm

Product size

75×45×15~200×75×20

Forming speed

15~30m/min

Barrel length

Max420mm

motor power

DC75KW

Horizontal forming stands

14 stands

Horizontal roll shaft diameter

75mm

Correction roll stands

2 stands

Drive method

 Motor—reducer—transfer case—cardan shaft—lower roll shaft

 

 

Payment terms:  30% advanced payment,  the balance payment should be paid before delivery.

 

Delivery: 4 months

 

Installation and commission:

1 The supplier will guide the installation and carry out commissioning, and will in charge of the rolls producing and settle the questions with the client to ensure the accuracy between rolls and equipment, finally to producing the qualified profile that this scheme appointed.

2 The supplier should supply the install files within two months after the contract take into effect.

3 The factory building, equipment foundation, and cooling pool supplied by buyer , according to suppiler’s data. The installation required tool (lifting equipment, tool, ect.), the auxiliary material (wire, tubing, pipe, etc.), labor by the buyer to arrange.

4 The buyer should supply the water, electric, gas to the equipment interface.


 

     Steel frame curtain wall profile production line

 

 

 

Contact Supplier

Mr. Bing Yu General Manager Chat Now
Telephone
86-25-84497725-13305193900
Mobile
13705166158
Fax
86-25-84591061
Address
No. 532-1,Zhongshan East Road,Baixia District, Nanjing Nanjing,Jiangsu

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Building Material Machinery > Pipe Making Machinery
Categories
Hi~