2000mm Slitting Line

2000mm Slitting Line

USD $156,000 - $300,000 /Set

Min.Order:1 Set

Supply Ability:
50 Set / Sets per Month
Port:
Nanjing
Payment Terms:
T/T

Quick Details View All >

Condition:
New
Type:
Other, Slitting Line
Pipe Material:
Carbon Steel
Application:
Other, Steel Plate Q235,Q345B,J55,X70,X80
Place of Origin:
Jiangsu, China
Brand Name:
Zhong qing

Nanjing Zhongqing Machine Making Co., Ltd.

Business Type: Manufacturer,Trading Company
Nanjing Jiangsu China
Main Products: pipe welding line ,cold roll forming line ,cut-to-length-slitting saw ,steel pipe packing machine

Product Details

 

2000mm Slitting Line

 

2000mm Slitting Line

 

BRIEF INTRODUCTION

This line is used for kinds of wide steel strip into certain width and then recoil them to meet the request for the cold roll forming steel line and high frequency welded pipe production line with the thickness of 1~6mm, and the width of 800mm~2000mm.

 

BASIC TECHNICAL PARAMETERS

SNITEMDESCRIPTION
1Model2000mm×16mm
2Max. Width1800mm
3Thickness4-16mm
4MaterialsQ235,Q345B,J55,X70,X80
5Welding Speed20-40m/min

Width 

Quantity   Materials
  4mm 8 strip  Q235,Q345
  12.7mm    3 strip       X70  
16mm2 strip  Q235,Q345

 

PROCESS FLOW

Coil storage→coil loading→uncoiling→guiding→flattening→feed-to-length→strip shearing→strip transport & kickoff→pallet lifting→longitudinal moving and stack output

 

INTRODUCTION OF MAIN COMPONENTS

 

1. Coil loading car

     Put on coil on the machine with functions of cent ration and lean.

2. hydraulic double-cone uncoiler

 

    one side of conical head rotate automatically with hydraulic clutch. Double-cone can open and shut movement or whole movement with arrester. Conical heads adopts hydraulic expansion.

3. Sheet guider and straightener

     consists of sheet guiding press roll, bending roll, scooping device, and receiving table

2000mm Slitting Line

4. End shear

    Hydraulic shear, used to divide coil or cut off sheet ends.

5. Centering guide device

Each one group of vertical guide roll is provided of two sides of steel sheet. Each roll group is fixed onto a sliding seat. By adjusting screw thread pair via handwheel, the sliding seat moves along sheet width direction to suit different sheet width.

6. Disc shear

   Use rotating disc shear proper for slitting.Drive power transmitted to upper and lower disc blade shafts via distribution cases; driven by DC55kW motor, whose speed tracks the whole line via PLC control; Machine frame uses stress relieved steel structure, processed as a whole piece; Hydraulic side exit type tool changing. Shear blade provided: totally 20 pieces in 10 sets.

7. Scrap barrel 

    Reel up cut off scrap edge, some of which can be used as baling straps.

8. Spiral accumulator   

    Working principle: Hydraulic cylinder of strip feeding unit holds down steel strip. The feeding motor drives the feeding roll to fill strip into the accumulator by friction force. The main motor rotates supply roll of the accumulator cage to store steel strip in the inner and outer storage zone. The drive motor will stop after one coil finished, and will resume feeding after cutting and welding of another coil.

2000mm Slitting Line

9. Wrapping and tensioning device

10.Separating and pressing device

11. Electric control and line linkage

12. Full line hydraulic system

 

 

DELIVERY

Four months after the contract comes into force.

 

 

PAYMENT TERMS

30% advance payment after signature of contract, 30% progress payment after two months, and 30% before delivery. Remain amount to be paid within 1 year after delivery.

 

 

PACKING

electric control part packed in wooden case, remaining nude packed.

 

 

AFTER-SALES SERVICE

The supplier will send technical persons to buyer’s site to carry out installation & testing and provide technical support. Relevant expenses shall be borne by the buyer. During testing, the buyer shall provide required plant building & equipment, testing material and manpower support.

 

1. PAINTING

 

Equipment surface shall be coated with antirust paint. Paint color can be decided by the buyer or by the supplier on his discretion.

 

2.FOUNDATION WORK

 

The supplier will provide the buyer with foundation drawing of the equipment, with construction and supervision of foundation at the buyer’s own responsibility.

 

The client shall prepare plant building, equipment foundation, and cooling water pool as per equipment data provided by the supplier. Necessary installation apparatus (lifting rig, tools), installation accessories (wires, conduits, water pipes), and helping labors shall be arranged by the client.

 

The client shall provide water supply, power supply, and air supply to machine interface.

 

3.WARRANTY

 

The warranty will cover a period of one year starting from delivery for machines under normal operation conditions (Force Majeure excluded).

 

 

 

QUALIFICATION CERTIFICATE

 

 

 

 

Contact Supplier

Mr. Bing Yu General Manager Chat Now
Telephone
86-25-84497725-13305193900
Mobile
13705166158
Fax
86-25-84591061
Address
No. 532-1,Zhongshan East Road,Baixia District, Nanjing Nanjing,Jiangsu

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Building Material Machinery > Pipe Making Machinery
Categories
Hi~