Gold Mining Equipment- Gold CIL Plant/Gold cyanide plant with 300tpd price
USD $1,580 - $98,650 /Set
Min.Order:1 Set
Henan Xingbang Heavy Machinery Co., Ltd.
Small Scale Gold Mining Equipment- Gold CIL Plant/Gold cyanide plant with 300tpd Manufacturer
Professional manufacture CIL/CIP gold processing plant with best quality and competitive price
CIP For Gold Cyanidation Process Plant by Active Carbon adsorption
CIP Plant Equipment Double-impeller Leach Tank For Gold Cyinadation Process Manufacturer
CIL Plant Equipment Double-impeller Leach Tank For Gold Cyinadation Process Manufacturer
Gold Mining Equipment- Gold CIL Plant/Gold cyanide plant with 300tpd price
(The most excellent turnkey project supplier, including experimental resaerch, engineering design, equipments manufacture , installtion and commision ,staff training, etc.)
Henan Xingbang offers turnkey solutions for 300tpd Gold Mining Equipment- Gold CIL Plant. We are one of the leading project suppliers for 300tpd Gold Mining Equipment- Gold CIL Plant and we work closely with our customers to fulfill their specific needs for a customized packaged solution. Specialized in the fabrication of these machines for18 years and this enables us to be in a leading position in the field of 300tpd Gold Mining Equipment- Gold CIL Plant .
The Gold CIL Process Plant:
The ore after grinding is fed to agritation and leaching tanks of cyanide solution, where the gold is dissolved in the cyanide. The pregnant solution is then transferred to a series of tanks, where carbon is added. The gold is adsorbed onto the surface of the carbon. The carbon, with gold attached, is removed by screening. The gold bearing carbon is then introduced into a heated sodium hydroxide-cyanide-water solution where the gold is dissovled. This concentrated solution is passed through a series of electrowinning cells, where the gold quickly plates (in about 3 minutes) onto the stainless steel cathodes. The gold is washed from the cathodes, with high pressure sprays, dried and melted, to be poured into molds for gold bricks, or ingots.
Gold Cyanide CIL Process Plants Equipments include the following equipments:
We have been in 300tpd Gold Mining Equipment- Gold CIL Plant for more than18 years. We have established a great deal of experience in recent years developing Small Gold Mining Equipment .Our 300tpd Gold Mining Equipment- Gold CIL Plant line mainly include following equipment:
1.Feeder
2.Jaw crusher, cone crusher
3.Vibrating screen
4.Belt conveyors
5.Ball mill
6.Spiral classifer
7.Hydrocyclone
8.Thickener
9.Leaching Tanks
10.Electrowinning and desorption device
11.Gold smelting furnace
We can supply the whole line of gold process plant, including:
a. crushing system
b. grinding and classification system
Medium and small gold dressing factories often use two-stage and a closed-circuit crushing. Large gold dressing factories adopt three-stage and a closed-circuit crushing. In order to improve the yield and the equipment utilization coefficient, the dressing factories generally follow the principle --much crushing and few grinding so that will reduce the size of grinding ore.
After being the first stage crushed, the raw ore comes into double deck vibrating sieve. Upper products go through re-crushing then come into the second crushing stage with the products in the middle. The second stage crushing products come back and mix with the first stage crushing products will to be sieved. After sieved, the final products come through first stage Ball Mill to be ground and then form close-circuit grinding with classification equipment. Grading overflow is graded by hydrocyclone then comes into second stage Ball Mill to be ground and then form close-circuit grinding with hydrocyclone.
Hydrocyclone overflow will do selective flotation at first. The froth product will come through second choiceness and third choiceness to become final concentrate product. After selective flotation, the tailings come through rougher flotation, first choiceness, second rougher flotation, third rougher flotation and tailings scavenging. Both the tailings that come out of first choiceness and the froth products that come out of tailings scavenging come into hydrocyclone to be re-graded and re-selected. Second choiceness and first choiceness form closed-circuit selection. Third choiceness and second choiceness form closed-circuit selection.
c. leaching system
d. desorption and electrowinning device
e. gold smelting system
Personalized reception: Offer the full and personalized service in the whole journey after you come to China.
Lifetime Technical Support: Offer one year of free equipment warranty and lifetime technical support.
Monitor Production Progress: You can monitor production progress personally any time after confirming the order.
Product Delivery: We have developed a long and good relationship with many shipping agents, such as APL, MSK, CSCL, MSC, etc.
Installation and Training: Send technicians to the client site for guiding the installation and adjustment, and training operators to complete the inspection and acceptance together with you.
Six Reasons of Choosing XBM: