2 Post Tilting Used Car Hoist
Negotiable /Unit
Min.Order:1 Unit
Qingdao Telian Machinery Co., Ltd.
2 Post Tilting Used Car Hoist is designed of two spaces of up and down as one unit. The bottom car can go in and out directly. When the upper space needs to park a car, the car in the bottom should be driven out.
Protective device
a. Anti-dropping device: to prevent the vehicle loading pallet from undesired disconnection.
b. Limited switch device: to protect the equipment running.
c. Photoelectric switch (device for checking the entrance of people and vehicles): to prevent the people from accidently entering into the equipment under operation.
d. Emergency switch: the emergency switch button is used to cut power off when there is anything abnormal during the equipment process.
Hydraulic drive, chain balancing device to ensure the balance both ends of rise and fall.
Low noise, smooth operation, save energy, low carbon and environmental protection.
Vehicle loading pallet fully enclosed design, to avoid oil leakage, rain and snow polluting the lower vehicles.
Electrical and driving parts with waterproof characteristics.
Simple structure, easy installation, minimal requirements for civil engineering.
It can be widely used in apartments, yards and lower height of basements.
Name | Tilting Parking Lift |
Model | PTJ 301-20 |
Weight of parking car | 2000kg |
Lifting height | 1750mm |
Total height | 1956mm |
Width between post | 2435mm |
Size of vehicle loading pallet (L*W) | 3340*2000mm |
Rated speed | 2.2m/min |
Motor | 2.2kw |
Warming devices | Yes |
Mode of operate | Button |
Mode of control | PLC control |
Mode of drive | Hydraulic driving, chain balance |
Electrics | 380v,3 phase; 220v single phase |
Dimension | 3711*2435*1956mm |
Space size | 5800*2500*3100mm |
1.About Delivery Term
Q: What's the delivery term for making business with us?
A:Usually we send the shipments in FOB term.However, the terms of CIF and C&F are acceptable which depend of clients.
2.About Delivery Time
Q:What's the delivery time after placing the order?
A:Usually it takes 15-50 days after we received your down payment .However, it would depend on our production line schedule(the timing clients place order)and the complication of the item.
3.About Payment
Q: what's the payment?
A:By T/T, 50% is paid in advance; balance befor delivery .
4.About Min Order
Q:What's the min order?
A:1 set.
5.About Warranty
Q:What's the warranty?
A:1 year for free; after sales service for ever.