5 to 10 Levels Automated Underground Parking Machine/Robotic Garage All Steel Structure
2800 - 5000 /Set
Min.Order:1 Set
QINGDAO SHITAI MAOYUAN TRADING CO.,LTD
Product Specifications
Brand Name | STMY |
Product Name | Fully Automatic Plane Movement Parking System |
Model No. | QDMY-PCLP (5-10 Floors) |
Mode of Operation | LCD /IC card/ Touch Screen |
Mode of drive | Motor & Chain (Traditional) Hydaulic & Wire Rope (New) |
Car Capacity | ≤2350kg |
Car Size (L×W×H) | ≤5300x1900x1550(mm) ≤5300x1900x2050(mm) |
Lifting Speed | 60m/min |
Sliding Speed | 80m/min |
Convey Speed | 42m/min |
Carrying method | Clamping tire type, automatic alignment system |
Monitoring system | Closed-circuit monitoring system (Central control room to monitor the entire garage operation) LED board displays the ultra-long, ultra-wide, ultra-high, in place, observation mirror and voice prompts |
Control System | The control system PLC uses Siemens PLC Control ; the contactors and relays use the Eaton brand; the reverse phase protector uses the Omron brand |
Other Parts Treatment | Spray Zinc firstly and then Spray-paint second time (Twice) |
Colors | Grey, Apple Green, Peacock blue (optional) |
Power Supply | 380V/50Hz ; 3Phase 5wire (Customized for different country demand) |
Workig noise | <65dB |
HS Code | 84289020 |
Warranty Term | 12 months for electrical key parts, 5 years for structure |
Certification | ISO9001 and CE |
Working Principle:
1)This Fully Automatic Plane Movement Parking System can park or pick cars automatically with a movement of vertical elevator and the reciprocating movements of conveyor on the same level. The car will be turned into right direction when it reaches into the parking room with the movement of a rotation pallet, and then the car will be driven in or out by the car owner easily.
2) When storing a car: The driver drives the vehicle to the entrance and exit of the equipment and swipes the card; The automatic door opens and the driver drives the vehicle into the access room; At the prompt of the guidance system, the driver stops the vehicle and leaves the vehicle; The driver leaves the access room and swipes again at the entrance and exit; The automatic door is closed, the equipment performs centering and rectification on the vehicle, etc. At the same time, the elevator (with traverse trolley and carrier) runs to be flush with access floor; The carrier conveys the vehicle to the traverse trolley on the elevator; The elevator runs up to the target layer; The traverse trolley moves horizontally to the corresponding position of the parking space; The carrier conveys the vehicle to the target parking space; the storage is completed.
3) When picking a car: The driver swipes the card at the entrance and exit of the device; The traverse trolley moves horizontally to the target parking space; The carrier conveys the vehicle to the traverse trolley; At the same time, the elevator runs to be flush with the target layer; The traverse trolley moves to the elevator; The elevator runs to be flush with access floor; The carrier conveys the vehicle to the access room. The automatic door is opened, and the driver drives the vehicle out of the room.
Adapted Places:
Public parking place, hotels, shopping mall, hospitals, commercial center, Residential parking lot, apartment, etc...
Major Components:
The equipment consists of seven major components, including Steel Structure, Elevator, Traverse Trolley & Carrier, Vehicle Centering System, Control System, Electrical System and Operating system.
Case Photos:
Sample Drawings:
All Above Ground
All Underground Ground
Important Tips:
1) Can do 5 to 10 floors.
2) Can do all steel structure (we provide), or mixed steel & concrete structure. (we provide steel structure part, the concrete structure part will be built by customer themselves at local.)
3) We can do some floors for SUVs or 100% SUVs spaces (according to customer's request).
FAQ
1. What trade term you can accept?
----FOB, CFR, CIF, EXW, FCA. (If you want check the shipping cost, tell us your nearest sea port).
2. What payment term can you accept?
---- 30%TT in advance, and 70%TT before shipping or 70%LC at sight.
3. How about the loading information and HS Code?
---12 months for electrical parts, 5 years for mechanical structure.
---ISO9001 & CE.