ALMACO Heat exchanger Automatic Fin Press Machine
Negotiable /Set
Min.Order:1 Set
1. High efficiency
2.New type
3.imported main parts
4.easy to operate
Heat exchanger Aufomatic Fin Press Line/Fin Press Machine
The fin press line is an automatic fin production line based on the latest Taiwan technology.
The fin press line consists of aluminum foil decoiling mechanism (photo-electric automatic decoiling), aluminum foil protection device, aluminum foil oiling device,
single and double jump latest low noise high speed precision press machine, high speed
precision fin mold, latest guide bar type fin stacking device, waste material collection device,
and electrical control system with HMI.
The fin press line can be used to produce the following fins:
Φ5*19.5*11.2*(6-24)R.
Φ7*21.0*12.7 or 20.5*12.7(12-24)R.
Φ7.94*22.0*19.05*(12-18)R.
Φ9.52*25.4*22.0or25.0*21.65*(12-18)R.
Φ10.2*20.0*15.5*(12-24)R.
Φ12.7*31.75*27.5*(6-12)R.
Φ15.88*38.0*32.91 or 38.1*22.2(6-12)R.
Φ19.4*50.8*38.1(4-8)R.
Φ20*34.0*29.5*(6-12)R.Φ25*(4-6)R.
Packaging & Shipping
fin press line
The machine is packed in plywood cases which can be moved through forklift by its feet.
The nearest sea port is Shanghai port which is the largest and most convenient port over China.
The delivery time is 60 days after receipt of down payment.
The machine can be loaded into normal container (20GP or 40GP).
Our Services
fin press line
Our company provides test-running service to the customers. We would send our engineers to the buyer's site for installation, test-running and training service. The customer should bear the following costs: round-way air ticket fare, and board and lodging, and daily allowance.
The warrantee period is 1 year after completion of test-running.
We provide technical support life-time.
HVAC Evaporator and Condenser Production Line
Including: heat exchanger bending machine; Long/short U-tube bending machine; copper tube straightening and cutting machine; fin press line; progressive fin mold; vertical/horizontal expansion machine; others.
Other Heat Exchanger Making Machines
Machines and/or molds for similar heat exchanger products and their accessories
FAQ
fin press line
1) Q: What is the power supply of the machine?
A: The power supply of the machine is to be decided by the customer's side. We are able to adjust the power supply (volt, and phase) through a transformer so that the machine is ready for use at the end user's site.
2) Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc.
3) Q: What is the payment term?
A: The payment term is 30% down payment, and 70% before delivery (T/T mode).
4) Q: What is the delivery time?
A: The delivery time of the machine is 60 days after receipt of down payment.
5) Q: What is the warrantee period of the machine?
A: The warrantee period is 1 year after completion of test-running.
Export Market Distribution: Total Sales Revenue (100%)
South America 30
Eastern Europe 10
Southeast Asia 10
Mid East 30
South Asia 20
Machine photo
Fin stock
Exhibition Site
Heat Exchanger machine production line
Factory photo
All of our goods will pass QUALITY INSPECTIONS before shipment.
Best after sale service, customer can follow their order situation any time, no matter on product line, warehouse or shipment.
More than 5 years experience in exporting to make your order more smooth.Less than one container loading is accepted.
On time delivery, in general 30 days. Multimode payment:T/T,L/C.
Special dimensions available according to request.
We have many certificates of our Products.
Accessories replacement if our product itself has quality problems during one year after receiving.