The description of grp panel water tank
Material | GRP/FRP/SMC |
Size | 1x1m, 1x0.5m, 0.5x0.5m |
Panel Shape | Ball shape |
Thickness | 1-5mm |
Remarks | Thickness Tolerance: ±0.2mm |
Volume | From 1m3 to 1000m3 |
COLOR | White,Blue,and so on |
SMC water tank physical and chemical properties | ensile strength (Mpa)≥60 |
Bending strength (Mpa)≥100 | |
Bending modulus (Gpa)≥7.0 | |
Pap hardness≥60 | |
Bibulous rate,%≤1.0 | |
Glass fiber content,%≥25 | |
Leakage | No leakage after filled with water |
Full of water deformation | Filled with water, wall maximum deformation after no more than 1.0% of the tank bottom center height, no more than 10 mm maximum deformation |
Water quality | Accord with GB5740 |
Packaging Detai | Product packaging by the standards of each country. |
Delivery Detai | Water tank leadtime within 30days |
Other Material
Material | Size | Panel Shape | Thickness | Remarks |
Stainless Steel 316 | 1x1m,1x0.5m,0.5m x 0.5m | Ball shape | 1-5mm | Thickness Tolerance: ±0.2mm |
Hot-dipped Galvanized Steel | 4ftx4ft,1x1m,1x0.5m,0.5x0.5m | “X”shape Ball shape | 1-5mm |
Hebei Sinta FRP Products Trading Co., Ltd is specializing in FRP products.Our products mainly include water storage equipment, water treatment products, pultruded profiles/sections, cable/meter box protective boxes (distribution cabinets) and other FRP finished products, which is FRP water tanks, FRP chemical storage tanks, FRP pipes, FRP cooling towers, FRP grating, FRP pultruded profiles, FRP pultruded tubes, FRP rods, FRP boards, FRP sheets, FRP square tubes, FRP cable protective pipes, FRP cable distribution cabinets, FRP meter boxes, FRP ammeter boxes, FRP ladders, FRP gully grating, FRP manhole covers, FRP handrails, FRP capsule apartments, PVC cooling tower fills etc.
Our factory
The factory has advanced production equipment to ensure product quality to meet standards, the company has sufficient inventory to ensure on-time delivery
Our market
From domestic to foreign countries, our sales network throughout many cities and regions, our products are well received in the market. At the same time, we continue to develop and research new products to meet customers' changing needs. We also attach great importance to environmental protection, to handle all the sewage drainage system, first-class treatment.
Packaging Detai:
Product packaging by the standards of each country.
Delivery Detail:Water tank leadtime within 30days
The water tank has been widely used in residential buildings, hotels, office buildings, R&D buildings, schools, malls, restaurants and other public facilities as well as places with high requirements for water quality, such as hospitals and food processing plants.
STEP-BY-STEP ASSEMBLY
TANKS FROM 1 TO 10,000M3 (260 – 2,500,000 USG)
Despite its’ great strength,GRP is lightweight just 1/3 one third the weight of an equivalent steel panel. All panels can be lifted by hand, with no special equipment required even where access is difficult, and installation can progress quickly and efficiently.
Step 1. Install steel footings on leveled concrete foundations.
Step 2. Align GRP panels to be pre-assembled.
Step 3. Place rubber sealant from ready-to-use roll between panels.
Step 4. Connect panels with bolts and nuts.
Step 5. Position bottom panel sections, and finish up base of tank.
Step 6. Position three sides of the tank.
Step 7. Position and fix roof panels and if required, roof support pipes and plates.
Step 8. Install reinforcement if required.
Step 9. Close up the tank with the fourth side.
Step 10. Finish the internal or external reinforcement.
Step 11. Fill and test.