Pasta Macaroni Machine,Macaroni Spaghetti Making Machine,Macaroni Production Line
USD $20,000 - $66,000 /Set
Min.Order:1 Set
Jinan Darin Machinery Co., Ltd.
Introduction
Macaroni Production Line can produce macaroni, spaghetti, Fusilli, penne and conchiglie with various shapes and sizes.
We are using unique extrusion process, many popular shapes in market, the rational design of
the production line, fully automatic, precisely control system, the host with the high and low pressure screw, to increase the range of use of raw materials, to reduce the cost and improve the
product quality.
Products
Macaroni Production Line can be used to produce screw, shell, round tube, square tube,
bend tube and so on.
Raw Material
The raw materials of Pasta Machine can be durum, maize starch, potato powder, potato starch, cassava starch or their mixture, etc.
Machine Material
Macaroni Production Line adoptsstainless steel structure, especially the parts in contacting with the raw material or products.
Voltage in China:
Three phases: 380V/50Hz; Single phase: 220V/50Hz, we can make it according to customers’ Local voltage according to different countries.
Process Flow
Mixer--- Screw Conveyor --- Single Screw Extruder--- Cutting Machine --- Hoister --- Roasting Oven--- Cooling --- (Packing Machine).
Machine Show
Technical Parameters
Output | Installed Capacity | Actual Capacity | Voltage / Frequency | Dimension |
100-150kg/hr | 70kw | 45kw | 380V / 50Hz | 1700 x 500 x 300cm |
Certificate
CE CERTIFICATE & ISO 9001 CERTIFICATE PROVIDED, WITH HIGH QUALITY AND STABLE PERFORMANCE.
Commissioning & After-sales Service
1. We make accurate factory layout design according to customer’s factory size; if the customerneeded, we could make workshop design with electricity power, water supply, gas power,
material storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country
immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start
for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 7-10 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and daily salary USD 100 are on client’s account.
Exhibition