Fried Instant Noodles Production Line
USD $25,000 - $50,000 /Set
Min.Order:1 Set
Jinan Darin Machinery Co., Ltd.
Fried Instant Noodles Production Line
Introduction
Fried Instant Noodles Production Line has perfect technology, compact structure,
original design and stable performance, is developed on the base of requirements of the
world market.
Certificate
CE CERTIFICATE provided, which strictly meet CE standards and EU countries import policy.
ISO 9001 CERTIFICATE provided, which strictly meet ISO 9001 standards
Samples
Features
Fried Instant Noodles Production Line realizes high automation, convenient operation,
low energy and small floor space, but assures all working procedures from feeding flour
to finished products can be accomplished once.
Fried Instant Noodles Production Line is only one tenth of that lager size equipment,
especially suitable to small-sized or self owned enterprise.
The corrugated instant noodle produced by this line is tenacious, smooth and transparent.
It is very easy to be saturated by water. All the machinery is made of stainless steel 304.
Using the advanced technology for nutrient and instant foodstuff complete lines, the plant is innovative
with advanced structure, excellent performance and reliable quality that provide an ideal choice for
the investor in foodstuff industry.
Technical Parameters
Model | DR-I | DR-III | DR-V |
Power Type | Steam or Electric | Steam or Electric | Steam or Electric |
Installed Capacity | 30kw | 60kw | 90kw |
Output (pcs | 11000 pcs/8hr | 30000 pcs/8hr | 50000 pcs/8hr |
Dimension | 26 x 0.7 x 1.5m | 65 × 15 × 6.5m | 105 × 15 × 6.5m |
Key Equipment
Commissioning & After-sales Service
1.We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2.After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3.1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4.Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5.It normally costs 10 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
6.The engineer’s round-trip flight tickets, accommodation and daily salary USD 60 are on client’s account.
Delivery