AAC panel making machine / AAC panel plant New technology Quality Choice
USD $350,800 - $1,438,500 /Set
Min.Order:1 Set
Linyi Wante Machinery Co., Ltd.
AAC panel and block making machine information
Sand / flyash bock machine capacity we offer
50,000 m3 AAC Block Plant; 60,000 m3 AAC Block Plant;
100,000 m3 AAC Block Plant; 150,000 m3 AAC Block Plant;
200,000 m3 AAC Block Plant; 250,000 m3 AAC Block Plant;
300,000 m3 AAC Block Plant; 350,000 m3 AAC Block Plant;
400,000 m3 AAC Block Plant; 450,000 m3 AAC Block Plant
AAC light weight brick making machine material proportion
Cement lime fly ash style aerated block raw material proportion
Name | unit | Cement lime fly ash |
flash | % | 75 |
cement | % | 5 |
lime | % | 15 |
gypsum | % | 4-5 |
Aluminum powder paste | 500g/cubic | 0.5-1 |
Water & material rate |
| 0.60-0.65 |
Casting system | OC | 36-40 |
Aluminum mixing time | S | 30-40 |
Cement lime Sand style aerated block raw material proportion
Name | Unit | Cement Lime Sand |
Sand | % | 75 |
Cement | % | 5 |
Lime | % | 15 |
Gypsum | % | 4-5 |
Aluminum powder | 500g/cubic | 0.5-1 |
Water & material rate |
| 0.65-0.75 |
Casting system | OC | 35-38 |
Aluminum mixing time | S | 30-40 |
AAC block production line process:
Step 1. Dosing and matching raw materials.
Step 2. Feeding matched raw material into pouring tank for mixing.
Step 3. Pour mixed materials into mould.
Step 4. Put mould into curing room for standstill hardening with temperature of 40ýý.This may take 2-3 hours.
Step 5-6. When block reachs a certain hardness(0.2-0.3Mpa) it would be hoistd and turned over by tilting hoistor which preparing for cutting.Then the block would be put on a cutting car and also demoulded.
Step 7-8. The cutting car transfer block through cutter for horizental cutting.
Step 9. After horizental cutting the cutting car would drive the block to below vertical cutting machine for vertical cutting.The whole cutting cycle may within 6 minutes.
Step 10. After cutting the block would be hoisted by a semi-finished hoister to the hardening car.
Step 11-12. The hardening car would transfer block into autoclave for hardening under a pressure of 1.3 Mpa with steam for 8-10 hours.
Step 13-15. The finished product leave out of autoclave and packing for delivery.
Step 16-17. After packing the side plate would return back to reorganize with demoulded mould.
Step 18. The mould would be clean-up and oil spraying for new cycle of pouring and cutting.
Step 19. Our plant can also make slab just pur steel bar into the slurry to reinforce the strength of slab.
AAC panel blocks making machine production line showing
AAC blocks building machine
Contact Person: Betty Liu Skype: bettyliu4260 Tel: 0086-18315730268