50000m3/year sand flyash copper AAC block making machine factory

50000m3/year sand flyash copper AAC block making machine factory

USD $350,800 - $849,801 /Set

Min.Order:1 Set

Supply Ability:
120 Set / Sets per Month
Port:
Qingdao
Payment Terms:
T/T Credit Card

Quick Details View All >

Condition:
New
Type:
Other, AAC block making machine
Brick Raw Material:
Sand
Processing:
Brick Production Line
Method:
Autoclaved Aerated Concrete
Automatic:
Yes

Linyi Wante Machinery Co., Ltd.

Credit Member 4 years
Business Type: Trading Company
Linyi Shandong China
Main Products: Block Machine ,brick machine ,mobile block machine ,clay block machine ,crusher

Product Details

Sand AAC block machine  / AAC Block Brick Machine factory information

  

 

Sand / flyash bock machine capacity we offer

50,000 m3 AAC Block Plant; 60,000 m3 AAC Block Plant;

100,000 m3 AAC Block Plant; 150,000 m3 AAC Block Plant;

200,000 m3 AAC Block Plant; 250,000 m3 AAC Block Plant;

300,000 m3 AAC Block Plant; 350,000 m3 AAC Block Plant;

400,000 m3 AAC Block Plant; 450,000 m3 AAC Block Plant

 

AAC light weight brick making machine material proportion

Cement lime fly ash style aerated block raw material proportion

Name

unit

Cement lime fly ash

flash

%

75

cement

%

5

lime

%

15

gypsum

%

4-5

Aluminum powder paste

500g/cubic

0.5-1

Water & material rate

 

0.60-0.65

Casting system

OC

36-40

Aluminum mixing time

S

30-40

  

Cement lime Sand style aerated block raw material proportion

Name

Unit

Cement Lime Sand

Sand

%

75

Cement

%

5

Lime

%

15

Gypsum

%

4-5

Aluminum powder

500g/cubic

0.5-1

Water & material rate

 

0.65-0.75

Casting system

OC

35-38

Aluminum mixing time

S

30-40

 

AAC block process:

50000m3/year sand flyash copper AAC block making machine factory 

Step 1.  Dosing and matching raw materials.
Step 2.  Feeding matched raw material into pouring tank for mixing.
Step 3.  Pour mixed materials into mould.
Step 4.  Put mould into curing room for standstill hardening with temperature of 40ýý.This may take 2-3 hours.
Step 5-6.  When block reachs a certain hardness(0.2-0.3Mpa) it would be hoistd and turned over by tilting hoistor which preparing for cutting.Then the block would be put on a cutting car and also demoulded.
Step 7-8.  The cutting car transfer block through cutter for horizental cutting.
Step 9.   After horizental cutting the cutting car would drive the block to below vertical cutting machine for vertical cutting.The whole cutting cycle may within 6 minutes.
Step 10.  After cutting the block would be hoisted by a semi-finished hoister to the hardening car.
Step 11-12.  The hardening car would transfer block into autoclave for hardening under a pressure of 1.3 Mpa with steam for 8-10 hours.
Step 13-15.  The finished product leave out of autoclave and packing for delivery.
Step 16-17.  After packing the side plate would return back to reorganize with demoulded mould.
Step 18.  The mould would be clean-up and oil spraying for new cycle of pouring and cutting.
Step 19.  Our plant can also make slab just pur steel bar into the slurry to reinforce the strength of slab.

 

50000m3/year sand flyash copper AAC block making machine factory50000m3/year sand flyash copper AAC block making machine factory

50000m3/year sand flyash copper AAC block making machine factory

Thanks for your attention, waiting to talk more details with you.

Contact Person: Betty Liu    Skype: bettyliu4260    Tel: 0086-18315730268

Contact Supplier

Ms. JoJo Liu sales manager Chat Now
Telephone
0086-539-8113558
Mobile
0086-17853995669
Fax
0086-539-8110558
Address
No.1 Building,kaiyuanshangcheng,No.10,Jinqueshan Road,Lanshan district Linyi,Shandong

You May Like

New Products

Find Similar Products By Category

Machinery > Building Material Machinery > Brick Making Machinery
Categories
Hi~