DAF device for sewage treatment plant
DAF device for sewage treatment plant
DAF device for sewage treatment plant
DAF device for sewage treatment plant

DAF device for sewage treatment plant

USD $3,600 - $20,000 /Set

Min.Order:1 Set

Supply Ability:
200 Set / Sets per Month
Port:
Qingdao
Payment Terms:
T/T Credit Card

Quick Details View All >

Place of Origin:
Shandong, China
Brand Name:
YIMEI
Model Number:
YMRF-10

Qingdao Yimei Environment Project Co., Ltd.

Business Type: Manufacturer,Trading Company
Qingdao Shandong China
Main Products: Waste Water Treatment Plant ,MBR Sewage Treatment Plant ,Dissoved Air Flotation Machine ,Jet Flow Air Flotation Machine ,Submersible Mixer

Product Details

DAF device for sewage treatment plant

 

 

 DAF device for sewage treatment plant

 

Product Discription

DAF is an alternative clarification process that uses micro air bubbles to attach and float flocculated particles and suspended solids to the water surface for removal.In contrast, sedimentation removes settled solids from the bottom.

Before the flocculated water enters the clarification chamber, millions of tiny air bubbles are released from the diffuser nozzles to the water, which attach and float the floc particles to the water surface. The air bubbles are generated in a pumped recycle stream by an air compressor and are dissolved in water through a packed-tower-type of saturator. The floated sludge is removed periodically to a desludging trough, and the clarified water flows to the bottom of the clarifying chamber and then to an effluent control weir for collection. The air saturator is used to dissolve air in the water and then generate bubbles to float the floc particles.

 

                   DAF device for sewage treatment plant 

  

Work Principle

By the compressor,the air will be sent into air tank.Then it will be taken in air dissolved tank by jet flow device.In the dissolved tank,the air will be liquefied under 0.35Mpa pressure.Then the liquefied are will be sent to air flotation tank.When released suddenly, the air will be dissolved out and turn into a microbubble group.The group will meet the flocculating suspension in the sewage which is sent by pump and already medicated.It will be absorded in the flocculated suspension while slowly rising up.Along with reduction of the suspension's density,the suspension will go up to the water surface.Finally,the SS and CODcr will be removed. 

DAF device for sewage treatment plant

 

 

 

DAF device for sewage treatment plant  

 

Product Overviews

DAF device for sewage treatment plant 

 

Advantages
  • Some of the main advantages of DAF include better performance for removing light particles such as algae, which are difficult to settle. DAF can also usually achieve lower effluent turbidity than settling, typically less than 0.5 NTU. It is not as sensitive to temperature, especially cold temperatures as is common in settling, and the startup time is very short, approximately 30 minutes. Further, DAF does not need to generate heavy floc for settling, so lower coagulant dosage and shorter flocculation time can be used. The process can also operate at much higher surface loading rates (SLR) than sedimentation, especially in the high-rate DAF processes, which can be up to 20 gpm/ft2.
Packaging&Shipping

DAF device for sewage treatment plant 

 

Company Information

Qingdao Yimei Environment Project Ltd. is found in 1988.We are located in the largest port city-Qingdao China. Our factary take up 36,000 square metres and there are more than 130 kinds machine for manufacturing. As a member of Shandong Province Environmental Protection Industrial Association, we have 360 staff and  72 experienced engineers.

Our main product is the equipment for Environment Protection and Waste Water Treatment.And the product is popular all over the world,such as Africa, North America,Domestic Market,Eastern Asia,Mid East.

 

DAF device for sewage treatment plant 

FAQ

[Q]How to buy your idea products?

[A]You can provide us your water sources, water quality, flow rate and ground area (contact us for more details). 

[Q]What is your payment terms?  

[A]TT and L/C are acceptable and TT will be more appreciated.30% deposit in advance and balance before loading.

[Q]What is the delivery time?

 [A] It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.

[Q]How to pack the products?

 [A]We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.

[Q]How to keep your equipments from corrosion? 

[A]We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.

[Q]How do you manufacture your equipment ?

[A]Our  machining technology  includes laser/plasma cutting, automatic welding,CNC cutting and bending.

[Q] How to install after the equipments arriving destination? 

[A] We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. 

 

 

 

 

If you are interested in our product and company,please do not hesitate to contact us.

 

 

 

Contact Supplier

Ms. lin chen manager Chat Now
Telephone
86-532-88180456
Mobile
0086-13853232196
Fax
86-532-88180610
Address
Chang an Road, Jiaonan Qingdao Qingdao,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Environment > Water Treatment
Categories
Hi~