LB-800 (64t/h) Asphalt Mixing Plant
Negotiable /Set
Min.Order:1 Set
Jiangsu Lionkin Industrial Co., Ltd.
No. | Item | Technical Specifications |
1 | Capacity(Moisture <5%) | 64 t/h |
2 | Capacity of cold aggregate | 3pcs x 8m3 |
3 | Size of drying drum | @1570x6500mm |
4 | Material temperature | 160 – 200°C |
5 | Type of main burner | Diesel or heavy oil |
Diesel tank capacity | 10,000Its | |
6 | Type of elevators | Sealed type, without dust overflow |
7 | Screen structure | 2 decks 4 segments |
8 | Size of screen | requested by users |
9 | Capacity of hot aggregate bin | 10t (4 parts) |
10 | Aggregate scale range | 1 – 825kg |
Accuracy | ≤±0.5% | |
11 | Bitumen scale range | 1 – 100kg |
Accuracy | ±0.25% | |
12 | Filler scale range | 1 – 100kg |
Accuracy | ≤±0.25% | |
13 | Mixer type | Horizontal & double axle |
Capacity of mixer | 800 kgs/batch | |
Mixing cycle | 45s, adjustable | |
14 | Dust cleaning system - Standard | ≤150mg/Nm3 |
Pattern | Cyclone + Wet Filter | |
Filtering efficiency | 70%~85% | |
15 | Air compressor pattern | screw type |
Control system | Single Computer system | |
Control room size | 3.0m(L)x2.2m(W)x2.4m(H) | |
16 | Bitumen heating and storage System | Rapid Heating Bitumen tank 1pc x 40m3 |
0.5 m3 Steam boiler |
Specification:
1. Cold aggregate feeding system |
|
1.1 Cold aggregate bin | 3pcs |
1.2 Belt feeder | 3sets |
1.3 Collecting belt conveyor | 1set |
1.4 Primary screen | 1set |
1.5 Rapid Feeding belt conveyor | 1set |
1.6 Warning system for no aggregate | 1set |
2. Drying drum heating system |
|
2.1 Drying drum | 1set |
2.2 Main burner | 1set |
2.3 Diesel tank | 1set |
3. Main tower |
|
3.1 Hot aggregate elevator | 1set |
3.2 Filler elevator | 1set |
3.3 Vibrating screen | 1set |
3.4 Hot bin | 1set |
3.5 Weighing system (aggregate, bitumen, filler) | 1pc |
3.6 Mixer | 1pc |
4. Dust cleaning system |
|
4.1 Primary dust cleaner | 1set |
4.2 Wet filter | 1set |
4.3 Vent | 1pc |
4.4 Chimney | 1pc |
5. Pneumatic system | 1set |
6. Control system |
|
6.1 Computer control system | 1set |
6.2 Monitoring system be included control system | 1pc |
6.3 Power distribution cabinet, cables | 1set |
6.4 Control room (with air conditioner) | 1pc |
7. Bitumen heating and storage system |
|
7.1 Rapid Heating Bitumen tank (50m3) | 1pc |
7.2 0.5 m3 Steam boiler | 1pc |
7.3 Bitumen pump | 1set |
8. Free spare parts | 1set |