Quick Laying Oil Boom
USD $45 - $100 /Meter
Min.Order:400 Meters
Tongxiang Xiaoying Pollution Control Technology Co., Ltd.
Quick Laying Boom
The quick-laying boom is used to contain and control oil spill on water areas such as sea or harbours. It is usually wound on the reel. In operating, it can be laid on waters without the need to inflate it. Therefore, the boom is the new oil spill control equipment that allows for the fastest deployment.
Features:
·With the double-layer casing made of high strength flexible materials, having high resistance to oil and sunlight and long service life.
·Used on water areas such as sea or harbours to contain and control oil spill from spreading. It can be deployed rapidly.
·Only two operators are needed; recovery method; mechanical.
Model
Parameter | JXY- KW800 | JXY- KW900 | JXY- KW1000 | JXY- KW1200 | JXY- KW1600 |
Overall height (mm) |
|
900 |
1000 |
1200 |
1600 |
Water height (mm) |
280 |
320 |
340 |
380 |
530 |
Underwater Depth (mm) |
420 |
490 |
540 |
650 |
840 |
Each standard length(m)
|
200 |
200 |
200 |
200 |
200 |
Total tensile strength(KN) |
60 |
65 |
70 |
80 |
100 |
Laying speed (m/min) | ≥ 40 | ≥ 40 | ≥ 40 | ≥ 40 | ≥ 40 |
Max. wave speed to withstand(m/s) |
0.8 |
1.2 |
1.5 |
1.8 |
2 |
Max. wind speed to withstand(m/s) |
6 |
8 |
10 |
12 |
16 |
Max. current speed to withstand |
0.8 |
1.2 |
1.5 |
1.5 |
2 |
Note: The technical data are subject to change without notice due to modifications to the product and shall be confirmed by the manufacture and the customer.