Copper Ore Beneficiation Plant for Sale Copper mining process
USD $3,000 - $80,000 /Set
Min.Order:1 Set
Henan Songshan Heavy Industry Co., Ltd.
Magnetic Separator,high gradient Magnetic separator,High Magnetic Separator
Popular in South africa Gold production line equipment China Manufacturer
Large output pyrite ore beneficiation production line China Henan Supplier
High efficiency copper concentrate production line equipment China Henan manufacturer
Copper Ore Beneficiation Plant for Sale Copper mining process
I. Copper Ore Beneficiation Specification & Appliciation
The raw copper includes native copper, copper oxide ore, Copper sulphide ore. The first option is to copper industry is native copper.
But the native copper is rarely. So the industry copper used chalcopyrite, chalcocite, bornite, cuprite and malachite which includes copper, instead of native copper.
For the industrial copper manufacture, the mining copper or blasted copper, should be loaded to copper crushing plant by a heavy copper truck.
II. Copper Ore Beneficiation Plant
1. Crushing stage. The copper ore should be transported into copper jaw crusher, copper impact crusher or copper cone crusher for the primary crusher by belt conveyor.
2.Grinding stage. After first copper crushing process, the copper ore less than 25mm will be transported into copper grinding mill ball mill for grinding.
The copper above25mm will be vibrating and recovery for the second crusher process. The processing will be going on until the copper ore below 25mm.
3.Separation stage. After grinding the fine -200 mesh copper powder be fed into the flotation separator for flotation processing . Also the flotation sell add in the agent, or mixing the agent in the agitator before flotation separation.
4. Filtering or Drying stage. The end concentrate can trough the filer or the dryer for drying it.
III. Copper ore Beneficiation Plant list
No. | Machine Name | No. | Name | No. | Name |
1 | Carrier | 12 | Belt conveyor | 23 | Slurry distribution pool |
2 | Bin | 13 | Batching system | 24 | Tailings treatment water |
3 | Mining feeder | 14 | Tramp-iron remover | 25 | Reagents mixer |
4 | Jaw crusher | 15 | Belt conveyor | 26-31 | Flotation separator |
5 | Belt conveyor | 16 | Feeder | 32-35 | Slurry pool |
6 | Belt conveyor | 17 | Water supply tower | 36 | Tailings storage |
7 | Jaw crusher | 18 | Ball mill | 37 | Thickener |
8 | Belt conveyor | 19 | Spiral separator | 38 | Vacuum filter |
9 | Mining feeder | 20 | Slurry pool | 39 | Belt conveyor |
10 | Cone crusher | 21 | Slurry pump | 40 | Concentrate |
11 | Belt conveyor | 22 | Ore mixer |
|
A. Proving beneficiation technology and consultation
B. Raw ore testing and evaluation
C. Site chosen consultation and evaluation.
D. Site design and layout design.
E. Installation, erection, and commissioning instruction
F. Workers training
For more information, pls contact us freely.