frp cold water tower
USD $800 - $1,000 /Set
Min.Order:1 Set
Dongguan Carno Machinery Co., Ltd.
frp cold water tower
1. frp cold water tower adopts the high quality PVC fill, its peak nested fan lines to enhance cold heat exchange ability, and is worth by high temperature of 60 °C, water cooling effectiveness guarantee as to the best level. At the same time with high temperature resistant type water tower supply, is worth by 60-95 °C high temperature water, especially suitable for electric power industries
2. Fan of frp cold water tower :axial flow fan, uses the advanced plastic, or aluminum alloy manufacture, every fan before they leave the factory will have been strictly set from small and balance test.
3. All metal main parts of frp cold water tower : the thick body steel manufacturing, the international standard hot galvanized antirust processing, but also provides full stainless steel fittings
4. frp cold water tower shell and chassis, are all acid alkali corrosion resistance of glass fiber reinforced plastic senior (FRP), all pipes and water spray equipment adopts advanced plastic, need not add the lubricating oil, ensure durability
1. Reference the operation quality of frp cold water tower and checking the safety coefficient of foundation bearing capacity. |
2. frp cold water tower should not be installed on the smoke, heat, open flame. |
3. frp cold water tower should not be installed on the presence of corrosive gas. |
4. frp cold water tower of the vent and the distance between the obstacles should be more than 3 m. |
5. Circulating water pump suction part should be set below the position of the cooling tower pond water. |
6. frp cold water tower should be set pipeline stages, the cooling tower don't directly pipeline under weight. |
7.The function of large refrigeration towers circulating water related, should check whether the reach regulation |
8. Regularly check large refrigeration towers water level, water temperature, the motor power, voltage, and cooling tower vibration and noise, etc. |
9.Winter operation of frp cold water tower should pay attention to not use ventilation window, easy is covered with ice and snow, cold water circulation,may cause the water system and packing frozen. |
Technical parameters of frp cold water tower
Detailed of frp cold water tower
Project case of frp cold water tower
Note:
1.T/T ,50% as deposite and the balance to be paid before shipment
2.With one year warranty
3.The machinery will be packed with standard wooden case
4.One unit in one international wooden case
5.Delivery time :About 20 days upon receipt of deposit
Thanks for your attention of our frp cold water tower and welcome to visit
our website and factory !