Trade assurance cooling tower components
Trade assurance cooling tower components
Trade assurance cooling tower components
Trade assurance cooling tower components
Trade assurance cooling tower components
Trade assurance cooling tower components

Trade assurance cooling tower components

USD $250 - $10,000 /Set

Min.Order:1 Set

Supply Ability:
500 Set / Sets per Month
Port:
Shenzhen
Payment Terms:
T/T L/C D/P D/A Credit Card

Quick Details View All >

Condition:
New
Cooling Type:
Cross Flow
Material:
FRP
Place of Origin:
Guangdong, China
Brand Name:
Carno FRP Water tower price
Model Number:
KN-50T FRP Water tower price

Dongguan Carno Machinery Co., Ltd.

Credit Member 4 years
Business Type: Manufacturer,Trading Company
Dongguan Guangdong China
Main Products: Industrial Chiller ,Mold Temperature Machine ,Plastic Crusher ,Suction Feeder ,Dryer

Product Details

 cooling tower components Trade assurance cooling tower components

 

 

Product Description

 

1. cooling tower components adopts the high quality PVC fill, its peak nested fan lines to enhance cold heat exchange ability, and is worth by high temperature of 60 °C, water cooling effectiveness guarantee as to the best level. At the same time with high temperature resistant type water tower supply, is worth by 60-95 °C high temperature water, especially suitable for electric power industries

 

2. Fan of  cooling tower components :axial flow fan, uses the advanced plastic, or aluminum alloy manufacture, every fan before they leave the factory will have been strictly set from small and balance test.

 

3. All metal main parts of  cooling tower components  : the thick body steel manufacturing, the international standard hot galvanized antirust processing, but also provides full stainless steel fittings

 

4. cooling tower components  shell and chassis, are all acid alkali corrosion resistance of glass fiber reinforced plastic senior (FRP), all pipes and water spray equipment adopts advanced plastic, need not add the lubricating oil, ensure durability

 Trade assurance cooling tower components

1. Reference the operation quality of  cooling tower components  and checking the safety coefficient 

of foundation bearing capacity.

2. cooling tower components should not be installed on the smoke, heat, open flame.

3. cooling tower components  should not be installed on the presence of corrosive gas.

4.  cooling tower components  of the vent and the distance between the obstacles should be more than 3 m.

5. Circulating water pump suction part should be set below the position of the cooling tower pond water.

6.   cooling tower components  should be set pipeline stages, the cooling tower don't directly pipeline under weight.

7.The function of  large refrigeration towers circulating water related, should check whether the reach regulation

8. Regularly check  large refrigeration towers  water level, water temperature, the motor power, voltage, and cooling tower 

vibration and noise, etc.

9.Winter operation of  cooling tower components should pay attention to not use ventilation window, 

easy is covered with ice and snow, cold water circulation,may cause the water system and packing frozen.

 

Technical parameters of   cooling tower components 

Trade assurance cooling tower components 

 

Packaging & Shipping

 

Detailed of cooling tower components Trade assurance cooling tower components

 

 

Trade assurance cooling tower components

Project case of cooling tower componentsTrade assurance cooling tower components

 

Company Information

 

Trade assurance cooling tower components

Trade assurance cooling tower components

Trade assurance cooling tower components

Trade assurance cooling tower components

 

 

Our Services

 

Trade assurance cooling tower components

Note:

1.T/T ,50% as deposite and the balance to be paid before shipment

2.With one year warranty

3.The machinery will be packed with standard wooden case 

4.One unit in one international wooden case

5.Delivery time :About 3-15 days upon receipt of deposit

 

Thanks for your attention of our  cooling tower components and welcome to visit

our website and factory !

 

 

 

Contact Supplier

Ms. Carno Yuan Foreign Salesgirl Chat Now
Telephone
86-0769-82200886,13631797575
Mobile
86-18122921942
Fax
86-0796-81081781
Address
Qiaozi Industrial Zone ,Changping Town,Dong Guan city GuangDong Province Guangdong

You May Like

New Products

Find Similar Products By Category

Machinery > Refrigeration & Heat Exchange Equipment > Cooling Tower
Categories
Hi~