strapping machine/packaging forming machine

strapping machine/packaging forming machine

USD $2,000.89 - $6,500.89 /Set

Min.Order:1 Set

Supply Ability:
40 Set / Sets per Month
Port:
Tianjin
Payment Terms:
T/T Credit Card

Quick Details View All >

Condition:
New
Automatic Grade:
Semi-Automatic
Usage:
Other Forming Machine
Place of Origin:
Hebei, China
Brand Name:
Kspack
Model Number:
YS-EJ

Cangzhou Kingsun Imp.& Exp. Co., Ltd.

Business Type: Trading Company
Cangzhou Hebei China
Main Products: High Speed Flexo Printer Slotter ,Single Facer ,Automatic Folder Gluer ,Pest Control Machine ,Paper Tube Machine

Product Details

strapping machine/packaging forming machine

 

 strapping machine/packaging forming machine

 1. The power:220V/50Hz,0.6KW/5A

2. The height of working table:850mm

3. The speed of bundling:1.6 second/road

4. The strapping tension:0-45kg

5. The requirement of bundling belt,YS-305 need the belt width are 5mm,YS-309 need the belt width are 9mm

6. The bundling type:parallel ont to many road,the way of bundling inching,continuous bundle,the switch are pedal

7. The machine weight:200kg

8. The bottom splice:The face of splice≥90%,the width of splice≥20%,the deviation of splice location≤2mm

9. The configuration of electric appliance

  1. 10. The working noise ≤75DB
  2. 11.  The working environment condition:humidity ≤98%,temperature 0-40℃

 

FAQ

1.Q.Your comapny belong to the trading comapny or manufacturer?

   A.Our company belong to the manufacturer,but our company have the qualification of        export.

2.Q.Your comapny if have the ability of OEM?

    A. Yes,our company can OEM.

3.Q.Where is your factory located in?

    A. Our factory located in DONGGUANG COUNTY,CANGZHOU CITY,HEBEI          PROVINCE,CHINA

4. Q.Which airport are near to your factory?

    A.The airport have BEIJIANG,TIANJIN,JINAN,if take the bus from beijing to   dongguang,it about need 3 hours.

5.Q.Which high speed rail station are nearest to your factory?

    A. It is CANGZHOU STATION,From the beijing to cangzhou by high speed train,it about need 1 hour.

6.Q.How about the trading process of your company?

   A. With customer talk about the requirement-Confrom the machine model with customer-Sign the sales contract-The buyer payment the deposite-The supplier arrange the production of machine-About need 30 days finished the production of machine-The buyer check the machine-The buyer payment the balance-The supplier arrange the shippment.

7.Q.How to control the machine quality?

    A. 1) Our company always pay attention to the machine quality,From the production                to shippment,we are very strictly.

         2) The raw materials are environmental protection,non-pollution.

         3) We have the prodessional technicist in charge for and supervision the                              production.

         4) Our company have the professional department of technology to checkout the                 every link of the machine production.

8.Q.Your company if can arrange the technicist to foreign factory set up the machine and debugging?

    A.Our company can arrange the technicist to foreign factory set up the machine and debugging,but the customerneed to charge for the cost of air ticket and room and board,besides it also need to charge for the technicist 80USD/DAY during the time in customer factory.

strapping machine/packaging forming machinestrapping machine/packaging forming machinestrapping machine/packaging forming machinestrapping machine/packaging forming machine 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

Contact Supplier

Ms. linda liu sales manager Chat Now
Telephone
86-317-7759118
Mobile
13785498142
Fax
86-317-7759118
Address
XINYI CENTER BUILDING1-320B , XINHUA DISTRICT, CANGZHOU CITY Cangzhou,Hebei

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Packaging Machine > Packaging Forming Machines
Categories
Hi~