computer-control single face slitter-cutter/Paper sheet cutter/Cardboard computer sheet cutter
USD $3,000 - $4,000 /Set
Min.Order:1 Set
Cangzhou Kingsun Imp.& Exp. Co., Ltd.
computer-control single cutter/paperboard sheet cutter/carton making machinery
High quality and heavy duty single cutter with new design handle
Single corrugated paper cutter/sheet cutting machine/carton box manufacturing machine
paper cutter/single face corrugated paperboard production line
computer control single cutter machine/cardboard sheet cutter/carton box forming machine
computer-control single face slitter-cutter/Paper sheet cutter/Cardboard computer sheet cutter
computer-control single face slitter-cutter/Paper sheet cutter/Cardboard computer sheet cutter
Characteristics
1.Manual adjust the rotate speed of P derailleur in order to change the length of required cardboard.
2.There are clearance adjustment set and gear parallel set at the gear between the edge roller, thereby assure move placidly, improve precision.
3.Adopt double brace speeder, make the edge shaft run in uniform motion, the instantaneous speed of cutting off edge in working are invariables with the running speed of cardboard.
4.Drive power from main transmission, good synchronization and high precision cutting.
Technical Parameter:
Design speed: 80m/min
Paper cutting range: 600-2600mm
Cutting off precision: ±2.5mm
Effective width: 1400mm-2200mm
computer-control single face slitter-cutter/Paper sheet cutter/Cardboard computer sheet cutter
1.Q.Your comapny belong to the trading comapny or manufacturer?
A.Our company belong to the manufacturer,but our company have the qualification of export.
2.Q.Your comapny if have the ability of OEM?
A. Yes,our company can OEM.
3.Q.Where is your factory located in?
A. Our factory located in DONGGUANG COUNTY,CANGZHOU CITY,HEBEI PROVINCE,CHINA
4. Q.Which airport are near to your factory?
A.The airport have BEIJIANG,TIANJIN,JINAN,if take the bus from beijing to dongguang,it about need 3 hours.
5.Q.Which high speed rail station are nearest to your factory?
A. It is CANGZHOU STATION,From the beijing to cangzhou by high speed train,it about need 1 hour.
6.Q.How about the trading process of your company?
A. With customer talk about the requirement-Confrom the machine model with customer-Sign the sales contract-The buyer payment the deposite-The supplier arrange the production of machine-About need 30 days finished the production of machine-The buyer check the machine-The buyer payment the balance-The supplier arrange the shippment.
7.Q.How to control the machine quality?
A. 1) Our company always pay attention to the machine quality,From the production to shippment,we are very strictly.
2) The raw materials are environmental protection,non-pollution.
3) We have the prodessional technicist in charge for and supervision the production.
4) Our company have the professional department of technology to checkout the every link of the machine production.
8.Q.Your company if can arrange the technicist to foreign factory set up the machine and debugging?
A.Our company can arrange the technicist to foreign factory set up the machine and debugging,but the customerneed to charge for the cost of air ticket and room and board,besides it also need to charge for the technicist 80USD/DAY during the time in customer factory.