light structure steel frame structure fabrication
USD $30 - $90 /Square Meter
Min.Order:100 Square Meters
Tianjin Zhongjie Jinchen Import & Export Trade Co., Ltd.
welcome to visit our factory anytime
specification of structure steel fabrication
No. | Type | structure steel fabrication |
1 | Material | Main steel strucrure--Q345/Q235 Secondary light parking steel structure shed design--Q235 |
2 | Wide span | Single span or multiple spans, the max span clear distance is 36m, without middle column |
3 | Roof and Wall | Option: Steel sheet,EPS, glass wool, rock wool or PU sandwich panel |
4 | Door and Window | PVC or Aluminum alloy; sliding door or rolled door |
5 | Column and Beam | Option: Welded H section |
6 | Purlin | Option: C-section or Z-section |
7 | Local Climate | 1. Wind speed |
8 | 2. Snow load | |
9 | 3. Rain quantity | |
10 | 4. Earthquake grade if have | |
11 | More details is preferred. | |
12 | Crane Parameter | If need crane beam, crane tons parameter and lift height are needed |
13 | Drawing | 1. according to clients' drawing |
14 | 2. design as per clients' dimension and requests | |
15 | Package | Naked loaded in shipping container or as per requests. |
16 | Loading | 20 GP, 40HP, 40 GP, 40 OT |
main materials
1.Q235,Q345 H section light structure steel frame structure fabricationfor columns and beam
2. Pre-embedding anchor bolts for connection columns to foundation
3. Intensive bolts for connection tween columns and beams.
4. Wall/roof panel: one layer corrugated stee plate or sandwich panels
5. Windows/door . PVC, aluminium alloy , steel etc.
6. Color steel plate or galvanized steel gutters and pvs tubes for rain water
types of H structure steel fabrication
types of C structure steel fabrication
types of Z structure steel fabrication
production process of structure steel fabrication
showing of structure steel fabrication
structure steel fabrication project
sandwich panels system
1. How to buy your idea products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, 50% balance before loading by TT.
2.What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 40 days.
3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
4.How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
company certificates