prefabricated insulated structural steel price per ton
USD $450 - $700 /Ton
Min.Order:10 Tons
Tianjin Zhongjie Jinchen Import & Export Trade Co., Ltd.
china steel frame house made from structural steel price per ton
Main Channel 38*12 Metal Profile adopting high-grade quality hot-dipped galvanized steel
C and U Slotted Perforated Galvanized Shaped Steel Profiled Strut Channel
Hot dip galvanized irregular shape steel,irregular steel profile,irregular steel channel
specification of prefabricated insulated structural steel price per ton
Brand name | zhongjie |
Item Name: | Steel Structure |
Material: | Grade Q235, equivalent to ASTM A36. Grade Q345, equivalent to ASTM A572. |
Section: | Any product shape according to customer's requirements |
Certification: | ISO quality system, Chinese GB50221-2001 |
Sand Blast: | Sweden SA 2.5 Sand blasting |
Welding: | Single level butt welding, fillet welding by electric arc welding, and Gas shielded welding. |
Surface treatment: | Hot dip galvanized, Standard: ISO1461(1999),JIS H 8641-1999,ASTM A 123/A 123M-02 |
Paint, 1, Primer paint, 2, middle paint, 3, finish paint. | |
Carry capacity | Resist strong wind and earthquake, bears heavy snow |
Advantage | Strong & safe ,easy to install and disassemble, good insulation |
waterproof, fireproof, low carbon, energy saving | |
Drawing | We can make the quotation according to customer's drawings. |
We can also design and quote according to customer's requirements. | |
| |
two kinds of surface treatment
| |
ü Hot dip galvanize | |
1, Standard: JIS, DIN, ASTM B695-2000 | |
2, Hot dip galvanizing hole cutting good looking on surface of | |
3, Galvanizing process: Steel structural components →Degreasing →Rinsing→ Pickling →Rinsing → Fluxing → Galvanizing →Quenching → (Passivation) → Inspecting →Finished Product | |
| |
ü Paint | |
1, Primer paint one coat 20-30 um | |
2, middle paint two coat 40-60 um | |
3, Finish paint one coat 20-30 um Paint Type: 1,red primer, 2,zinc primer, 3,Alkyd primer |
prefabricated insulated structural steel price per ton of H type
prefabricated insulated structural steel price per ton of C type
prefabricated insulated structural steel price per ton of Z type
prefabricated insulated structural steel price per ton production process
showing of prefabricated insulated structural steel price per ton
workshop of prefabricated insulated structural steel price per ton
prefabricated insulated structural steel price per ton project
corrugated sheet system
sandwich panels system
company certificates of prefabricated insulated structural steel price per ton
1. How to buy your idea products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, 50% balance before loading by TT.
2.What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 40 days.
3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
4.How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.