multifunction pressure fryer(PASS CE,MANUFACTURER,NEW-STYLE)

multifunction pressure fryer(PASS CE,MANUFACTURER,NEW-STYLE)

USD $300 - $500 /Set

Min.Order:10 Sets

Supply Ability:
565 Set / Sets per Month
Port:
SHANGHAI
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal

Quick Details View All >

Place of Origin:
Shanghai, China
Brand Name:
CNIX
Model Number:
MDXZ-16
Power Source:
Electric

Shanghai Yixi Food Machinery Co., Ltd.

Business Type: Manufacturer,Trading Company
Shanghai China
Main Products: Pressure Fryer ,Open Fryer ,Chicken Fryer ,Bakery Equipments ,Rotary Oven

Product Details

Specifications

small volume,easy operation,stainless-steel material,pass CE certificatesmall volume,easy operation,stainless-steel material,pas


And the placement should be back from the walls to maintain 8-10, and maintaining good ventilation. Exhaust top row can be equipped with the best fans;

2. Do not flammable items (such as towels, etc.) on the bombing furnace vents; otherwise it would cause combustion, leading to fires;

3. The other not to use the gas for fuel pan fried; otherwise there will be dangerous;

4. The end of the use of temperature control switches must be turned off to cycle position, and closed the valve on the tank;

5. If three consecutive failed fire, we have to wait a few minutes and try again after the fight to prevent the explosion;

6. The new furnace to be used in lining behind the battery box loaded two on the 1st of high-quality batteries otherwise it is impossible to lighters and automation;

7. If leakage should be closed immediately LP gas valve, open windows, enhanced ventilation. Turn off the power supply and fire, to be ruled out of order before reuse;

8. Vinegar and oil-not too high, no oil spill, as it is dangerous.

Use:

1. Bottled gas pipeline connected and checked inlet is linked closely reliable, and will be used after the firm;

2. open the gas cylinder valves clockwise to reverse the direction of the ignition switch and temperature control can automatically ignition time the ignition light shine, slowly turn the knob so that the calibration markings at the required temperature, and observed Perspective Kong already lit, to ensure that the heater has been on fire, without fire, and dashing out of temperature control switches back to the rotation relevant location and then pilot. If continuous ignition 5-8 seconds is not on fire, police and issued bright light Alarm, if not on fire three times, be suspended after a few minutes and try again, and check whether there are gas , Whether the valve is opened, the ignition whether an electric battery, whether it is normal contact, such as troubleshooting after the affirmative;

3. should be used after the ignition (temperature) rotary switch back to the relevant location, and quickly turn off the valve cylinders, cover pot cover, the temperature dropped to Yau released later, after filtration reserve;

4.pot cover to clean and maintain a platter with, and with the lid off, they should pay attention to not have water, prevent water from heat and drop in vinegar and oil spatter wounding;

5. No time should open the battery box; remove the battery, battery against taking power, corrosion;

6. The body should be kept clean pot; the oil must be at the temperature dropped to room temperature after regular cleaning of oil residues, and promptly changed to new oil;

7. the bombing of the furnace temperature control setting up functional, but should always pay attention to artificial custody, Temperature control was found to be too high time to switch off the gas supply to check temperature control device avoid dangerous high temperature (Generally through the food system in the course of bombing the color and time to judge temperature is too high or too low of )

8. Operators need to temporarily leave the scene of bombing the system, it must first shut down natural gas resources, and recognizing bombing furnace stopped working after the order to leave, so as to avoid causing accidents. Prohibited minors or those who are old and weak and unhealthy work on the bombing furnace. 

1. And the placement should be back from the walls to maintain 8-10, and maintaining good ventilation. Exhaust top row can be equipped with the best fans;

2. Do not flammable items (such as towels, etc.) on the bombing furnace vents; otherwise it would cause combustion, leading to fires;

3. The other not to use the gas for fuel pan fried; otherwise there will be dangerous;

4. The end of the use of temperature control switches must be turned off to cycle position, and closed the valve on the tank;

5. If three consecutive failed fire, we have to wait a few minutes and try again after the fight to prevent the explosion;

6. The new furnace to be used in lining behind the battery box loaded two on the 1st of high-quality batteries otherwise it is impossible to lighters and automation;

7. If leakage should be closed immediately LP gas valve, open windows, enhanced ventilation. Turn off the power supply and fire, to be ruled out of order before reuse;

8. Vinegar and oil-not too high, no oil spill, as it is dangerous.

multifunction pressure fryer(PASS CE,MANUFACTURER,NEW-STYLE)

Contact Supplier

Ms. Anita She General Manager Chat Now
Telephone
86-21-67690769
Mobile
0086 18221324118
Fax
86-21-67690742
Address
No.1115 Yifu Road, Jiuting Town, Songjiang District, Shanghai, China Shanghai

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Food & Beverage Machinery > Fryer
Categories
Hi~