low price gi cast iron elbow ,gi fittings,90degree street elbow 92
USD $0.01 - $100 /Piece
Min.Order:1000 Pieces
Chengde Kaida Casting Co., Ltd.
CHEGNDE KAIDA WELCOME YOU
Manufacturer Cast Iron Pipe Fitting Hardwares Factory
China Malleable galvanized hardware
Advantages of our company:
Chengde Kaida Casting Co., Ltd., located in Chengde Hebei province , annual production more than 5,000 tons,covers an area of more than 30,000 square meters, the predecessor of which is Chengde Malleable Iron General Factory founded in 1958.
The aim of our factory is Quality First, Customers First and Reputation First.
Our main products:
Product Item | Malleable cast iron pipe fitting |
Size | 1/8"-6" |
Thread Standard | BS DIN NPT/ANSI |
Finish | Hot-Dip Galvanization |
Packing | Cartons, woven bags, wooden boxes |
Quality Control | Excellent material, precise angles, good antirust property |
Product Usage | Suitable for joining pipe lines of team, gas, oil, air |
Tensile Strength: ≥330Mpa ; Elongation Rate: ≥8%;Hardness:≤HB150 | |
Suitable for pressure Max 1.6MPA, temperature Max 200°C | |
Chemical:C:2.4~2.9 Si:1.2~1.7 Mn:0.3~0.55P:0.12 S:0.18 Cr:0.09 |
Packing:
Inner packing: plastic bag.
Outer packing: double carton boxes:
Certification:
Main project:
FAQ
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 45 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
Thanks for your attention. If you have any questions, Please feel free to contact me ,it will be highly appreciated!
CHEGNDE KAIDA WELCOME YOU