Double In-line Package Lead Free Wave Soldering Machine
USD $1.00 - $1.00 /Set
Min.Order:1 Set
Shenzhen Lituo Chuang Neng Electronic Equipment Co., Ltd.
Medium reflow soldering is cheaper and more energy efficient than large scale, and is more efficient than small capacity. ( The furnace capacity: 280KG)
The main function of the configuration :
1:Lenovo LCD computer + Siemens PLC system.
2:The latest version of LT energy saving control program system .
3: A highly corrosion and resistant high life, equipped with special solder furnace.
4:280KG small-capacity free solder furnace.
5:SMC rodless cylinder control spray
6:Manually adjust the width of the device
7: Tin stove manual access device
8:1.2M (two groups) like drawer Hot-air heating systems
9:Ductile cast iron heating plate (energy-saving 40%)
10:Strong wind cooling device
11:Automatic feed plate means
12:Tin stove over-temperature protection
13:Preheating transport wind motor (Panasonic)
14: Furnace motor (Italy B & M)
15:Transport motor: Taiwan Leeming
16:Peak frequency regulation: Delta converter
17: Transmission speed control: Panasonic DV1234 stepless adjustment
18:Wave soldering interface board 220v
Lenovo LCD computer + Siemens PLC system.
Strong wind cooling device
Manually adjust the width of the device
Automatic feed plate means
Can match Wave Soldering PCB front Conveyor
The main technical parameters:
1. Dimensions: 3320 × 1350 × 1700 (MM)
2. Weight: 950KG
3. PCB transport height: 750 ± 20 mm
4. Transport speed: 0-2000mm
5. Transfer direction: L - R (from left to right)
6. PCB Width: 50-300mm
7. Transmission motor power: 220V 60W
8. Spray Transmission: SMC rodless cylinder
9. Preheat Zone Length: 1.2M
10. Preheat mode: Hot-air heating
11. Number of preheating zone: Two Drawer
12. Preheat the total power: 10KW
13. Preheat temperature control: room temperature -250 degrees
14. Temperature control mode: PID + SSR
15. tin bath Material: 3 mm 304L
17. The furnace capacity: 280KG
18. Pot temperature: room temperature -350 degrees
19. A furnace heater plate power: 1.0KW × 10
20. Tin furnace heating time: 120min
21. Wave Height adjustment: The Promise inverter control
22. Cooling: forced air (multi axial fan cooling)
23. Power supply: three-phase five-wire 380 V 100A 50 / 60HZ
24. Total power: 20KW
25. Actual power consumption: 5KW
Touch screen type
Button control type
The company has set up the equipment exhibition hall in Shenzhen,
welcome the foreign friends to come to visit.
Our service:
1. Quick response within 24 hours.
2. On time delivery.
3. Techinical support before and after sales.
Contact us:
Shirley Xie(Sales Supervisor)
**************************************************************************
SHENZHEN LITUO CHUANG NENG ELECTRONIC EQUIPMENT CO., LTD
Shirley Mobile( Whatsapp): 86 13632687345
Assistant General QQ: 2823023317 wetchat: xst827514933
Tel:0755-27231258-8005 Fax:0755-27231256
Adress:Building 21~22, Ma'anshan second industrial zone, Shajing Street, Ban'an district, Shenzhen