Most Professional high-pressure Raymond mill
USD $1,200,000 - $3,000,000 /Set
Min.Order:1 Set
Jiangsu Haijian Stock Co., Ltd.
China Top Brand Raw Material Vertical Mill
of Jiangsu Haijian Stock Co.,Ltd
1) Brief Introduction of Vertical Mill
Vertical Mill is widely used in mining industry, chemical industry and metallurgical industry to grinding material into fine powder. The finished powder can be used for water proof material manufacturing, producing abrasive material, etc.
2) Application of Vertical Mill
Vertical Mill is a used for milling materials into powders after they are crushed. Vertical Mill is widely applied to the production of dolomite, kaolin, marble, silica sand, cements, silicate products, building materials, fireproof materials, fertilizers, ceramics as well as nonferrous and ferrous metal processing industries
3) Structure of Vertical Mill
The machine is included of Vertical Mill, blower, analyzer, cyclone separator, dust collector, and duct system. The main mill is consisting of up and down body, grinding roller, grinding ring and reducer. We also offer jaw crusher, elevator, vibrating feeder, electric control gear and motor, etc according to the users' requirement.
Features of High Capacity Vertical Mill for Powder Grinding:
1. Force-Feed Lubrication
System Force-feed lubrication system extends the service life of bearing by 2.5 times.
2. Maximum Particle Fineness
Traditional roller mill either uses a static separator or dynamic separator to separate fine powder from coarse particles.Vertical coal mill brings together both types of separators for more efficient, adjustable material separation.
3. 20-40% Electricity Savings
Vertical coal mill uses 20% to 40% less electricity than a traditional air-swept ball mill for the same amount of grinding task.
4. Great Drying Performance
Air-swept milling method allows our mill to handle coals of up to 10% moisture content via varying its air flow rate and temperature.
5. 80-85dB Noise Level (Grade A)
Vertical coal mill is just 20-25dB quieter than ball mill.
6. Occupying less area
Vertical coal mill only takes up 60% of space needed to accommodate an equivalent ball mill, while its specific surface area is only 50% to 60% of the ball mill.
Work Principle of High Capacity Vertical Mill for Coal Grinding :
The materials drop to the center of millstone through the lay-off tube, and the millstone, which is rotating at constant speed, scatters evenly the material to the outside by means of centrifugal force, making it form material bed with certain thickness. Meanwhile, the material is rolled and smashed by multiple rollers. The material gradually move to the fringe of millstone under the continuous of fringe force, when the leaving material meets the hot gas enter into mill through the vane and moves upward, entering the separator through the central casing of the mill, the material and the gas achieve sufficient exchange and moisture is evaporated quickly in the process. Powder concentrator controls the granularity of finished product at exit of roller mill, granules that are larger than regulated size are separated and fall to the millstone, while those materials satisfying the fineness requirement enter the finished product storehouse through the powder concentrator.
Technology Doucment of HJRM Raw Material Vertical Mill
Mill model | Dia. Of mill (mm) | Average diameter of mill roller(mm) | Number of mill roller | Speed of mill disc (rpm) | Capacity (t/h) | Loading power(KW) |
HJRM raw material vertical mill | ||||||
HJRM13.20 | 1,300 | 1,100 | 2 | 43 | 25 | 200 |
HJRM16.20 | 1,600 | 1,180 | 2 | 45.77 | 26.4 | 200 |
HJRM18.30 | 1,800 | 1,120 | 3 | 43.16 | 43.9 | 330 |
HJRM19.30 | 1,900 | 1,180 | 3 | 42.01 | 50.4 | 380 |
HJRM20.30 | 2,000 | 1,250 | 3 | 40.94 | 57.8 | 430 |
HJRM22.30 | 2,200 | 1,400 | 3 | 39.04 | 77 | 580 |
HJRM23.30 | 2,300 | 1,450 | 3 | 38.18 | 83.5 | 630 |
HJRM26.30 | 2,600 | 1,600 | 3 | 35.91 | 108.1 | 810 |
HJRM30.30 | 3,000 | 1,700 | 3 | 33.43 | 126.9 | 950 |
HJRM30.40 | 3,000 | 1,400 | 4 | 33.43 | 160.8 | 1100 |
HJRM32.40 | 3,200 | 1,400 | 4 | 32.37 | 168.7 | 1200 |
HJRM32.40 | 3,200 | 1,500 | 4 | 32.37 | 188.7 | 1300 |
HJRM34.40 | 3,400 | 1,500 | 4 | 31.4 | 197.3 | 1400 |
HJRM36.42 | 3,600 | 1,700 | 4 | 30.52 | 231.7 | 1600 |
HJRM38.42 | 3,800 | 1,700 | 4 | 29.7 | 266 | 1900 |
HJRM40.42 | 4,000 | 1,800 | 4 | 28.95 | 307 | 2100 |
HJRM43.42 | 4,300 | 1,900 | 4 | 27.92 | 357.4 | 2500 |
HJRM46.42 | 4,600 | 2,060 | 4 | 27 | 436.2 | 3100 |
HJRM48.41 | 4,800 | 1,900 | 4 | 26.43 | 386.5 | 2700 |
HJRM48.42 | 4,800 | 2,060 | 4 | 26.43 | 449.8 | 3100 |
HJRM50.41 | 5,000 | 2,240 | 4 | 25.89 | 516.3 | 3600 |
HJRM53.41 | 5,300 | 2,360 | 4 | 25.15 | 595.6 | 4200 |
HJRM53.42 | 5,300 | 2,500 | 4 | 25.15 | 630.6 | 4400 |
HJRM56.42 | 5,600 | 2,500 | 4 | 24.47 | 655.7 | 4600 |
Some pictures of Vertical Mill
Test Process
Our Services of Vertical Mill
Pre-sales Service
1. Offering comprehensive technical and business consultation services;
2. Proposing the most suitable scheme and equipment for our clients;
3. Designing and fabricating targeted products according to the special requirements of clients;
4. Training periodically high qualified service technician.
After-sales Service
1. Highly inspecting equipments in every working procedure, quality comes first;
2. Fast & Safe Delivery;
3. Assisting our clients for foundation construction of equipments;
4. Dispatching engineers to install and debug equipments;
5. Training the first-line operators on site;
6. Regularly visit clients to solve production problems;
7. Providing life-long maintenance service;
8. Providing technical exchanging;
FAQ
How to choose the suitable grinding mill?
1. Know the hardness of your own ore.
2. Choose the energy-saving grinding mill to the great extent.
3. Know the ore fineness required.
4. Choose the right diameter and length of the grinding mill according to the output requ irement.
5. Buy it from the professional grinding mill manufacturer relative to your ore which would be best.
6. The manufacturer should hold the market share in the place where your enterprise located.
Company Brief Introduction
Haijian Company is situated in the world-famous Yangtze River Delta Economic Zone, Shanghai Economic North circle---Jiangsu Haian. This boasts lots of picturesque sceneries and outstanding talents. The company is 200 kilometers away from Shanghai---the cosmopolis---to the south and from Nanjing ---the capital of Jiangsu Province to the west.
Haijian, established in 1970, was reformed into a provincial public run shareholding enterprise in November 2003. It is staffed by 500 workers, 25% of whom are engineering technical management personnel. The company covers an area of 100000 square meters, with a building area of 55000 square meters. It possesses fixed assets worthy of close to 0.1 billion yuan, and it holds own 65 million yuan in all. It machines and cuts 50000 tons of produces every year.
Main Building House
Name | Building time | Building area (m2) | Length (m) | Width (m) | Height (m) | Hoisting weight (T) |
Metal Machining workshop(I) | 1974 | 616 | 44 | 14 | 7.2 | 5 |
Metal Machining workshop(II) | 1982 | 540 | 36 | 15 | 7.2 | 5 |
Metal Machining workshop(III) | 1980 | 792 | 44 | 18 | 9.5 | 10×2 |
Metal Machining workshop(IV) | 1995 | 3672 | 102 | 36 | 10.2 | 20×4 |
Rivet welding workshop(I) | 1985 | 1512 | 42 | 36 | 10.2 | 20×2 |
Rivet welding workshop(II) | 1983 | 756 | 42 | 18 | 10.2 | 10×2 |
Rivet welding workshop(III) | 1996 | 4998 | 102 | 24.5×2 | 20.2 | 20,30,50,75,80 |
General assemble workshop | 1994 | 6426 | 102 | 21×3 | 10.2/19.2 | 20×3 10×2 |
Electric workshop (I) | 1991 | 756 | 42 | 18 | 12 | 10 |
Electric workshop (II | 1993 | 1512 | 42 | 36 | 12 | 20×2 |
Office building | 1988 | 2400 | 60 | 8 | 20 |
|
Warmly welcome to Haijian to conduct instruction, negotiation, investment and cooperation for our common development and prosperity
Add: No.198 Shuanglou Road Qutang Town Haian County,Jiangsu, PRC
Tel/FAX:0086 513 88792415
Website: