Product Description
AT010 Series Rotawash Color Fastness Tester is used to determine color fastness to washing or day cleaning.
Standard
AATCC 61 /86 /132 /151 /190 | NEXT 2/3/5 | BS 1006 |
M&S C4A /C5 /P3B /C10A/C11/C26/C37/C49A/P137 | ISO105-C01/C02/C03/C04/C06/C07/C08/C09/D01/E03/E12 | IWSTM 7/ 115/ 177/ 193/ 199/ 240/ 241 |
FTMS 191-5610/5622 | JIS L0884 | GB/T 3921/5711 |
Specification
Model | AT010 Series |
Washpot capacity | ISO: 550ml, AATCC: 1200ml |
Washpot number | 8, 12, 14, 16, 18, 24 pcs selectable |
Speed of rotation rack | 40r±2r/min |
Preset time | 0.1~999.9min |
Time control error | <0.1min |
Heating power of working chamber | 1500w×3 |
Heating power of preheating chamber | 1000w×3 |
Temperature control range | RT~95℃ |
Temperature control accuracy | ±2℃ |
Power supply | AC380V, 50Hz |
Dimensions | 1150*600*1000mm (with pre-heating tank) 650*600*1000mm (without pre-heating tank) |
Weight | 128kg (with pre-heating tank) 75Kg (without pre-heating tank) |
Details & Features
★ Touch screen control heating temperature, running time etc.
★ Internal chamber adopt 304 stainless steel material
★ Build-in 5 test program, save operate time and 3 programmable test to meet more request from customer.
★ Technical date real-time display
★ Key parts adopt imported components
★ Temperature adopt self-calibration to avoid deviation
★ The machine equipped with door status detect device, the machine will stop running when the door was open to protect operator
★ Adopt timing-belt to keep he machine working precision and quietly. The bearing is install out of working chamber to avoid damage.
★ Provided with 550ml washpot for ISO/GB test or 1200ml washpot for AATCC as standard configuration
Our Company
History
Since 1982 with more than 20 years’ experience
Warranty
Two Year Warranty for whole product
Training
Video and user manual for training
Onsite service
Installation and training service is available
Testing service
Free sample testing before order is available
Lead time
15 working days lead time for most product
Packing & Delivery
Packaging | ||
Packaging Details | 1. The equipment is covered with film is protect it from water vapour during the trip. 2. The box is filled with foam to protect the equipment from impact. 3. Exported wooden box made from plywood, don't need fumigated. |
Payment
Payment Term | T/T | EXW | 30% T/T in advance, paid the balance before shipment | ||
FOB | |||||
CFR(C&F) | |||||
CIF | |||||
L/C | L/C amount above 50,000 usd, we can accept L/C at sight | ||||
West Union | Amount lower than 5000usd | ||||
West Union | |||||
Delivery Time | 7~10days after receiving payment for one container |
Contacting Us