Product Details

Communicating Vessel Type AirLock (could save energy up to 90-95%, its power is low, power of the largest motor is 180W)

Condition Used
Place of Origin Hubei, China
Certification ISO9001
Warranty 1 Year
After-sales Service Provided Engineers available to service machinery overseas

Product Features

Communicating Vessel Type Air-Lock  

I. Overview

GFL series is a new type air-lock, it adopts dual channel communicating vessel type structure form, different from traditional impeller type air lock device; its outstanding features and advantages: power consumption is about 10% of the impeller typeair lockof the original capacity.

GFL series air lock offers 5 specification types,  i.e. 9L,12L, 16L, 25L, 40L. It may be divided into electric, pneumatic modes according to the drive mode, power is 120-220W. It has been used extensively in building material, food, grain, fodder and other industries.

 

II.Operating principles

 

This air lock has two material channels, adopts a structure similar to the ship lock connector type structure at Three Gorges Dam. Two channels feed and discharge materials in turn, ends of the channels are connected in series for circulation purpose, so as to realize material discharge requirements in a sealed manner.

 

 

 

 

 

 

 

III. Equipment features

 

1. The product has obtained national patent for invention, could save energy up to 90-95%, its power is low, power of the largest motor is 180W, compressed air flow is 400L/h.

 

2. This series of equipment is driven by motor or cylinder; easy for installation and repair;

 

3. Interchangeable with traditional products of the same specification, the connection dimension, height dimension are the same.

 

4. Flexible seal; sealing element adopts food-grade material, could resist wearing, is easy for replacement. The seal is tight;

 

5. Complete variety; positive pressure blowing auxiliary system, motor anti-burnout auxiliary system, discharging speed regulating auxiliaries, metering auxiliary system and all stainless steel housing may be selected for different service conditions.

 

 

2. Outline Dimension Drawing

 

 

 

3. Inlet/outlet flange dimension

 

 

 

V. Installation, operation and maintenance

 

1. Installation and operation

 

A professional operator is required for the installation and commissioning, he shall check whether the material inlet/outlet is sealed well, whether the hopper is installed. Check whether motor line voltage is normal and check ground resistance of the housing; check whether sufficient lubricating grease has been filled before operation; check whether there is any abnormity after the motor starts; always stop timely for troubleshooting if there is any abnormity, so as to prevent unnecessary losses.

 

2. Maintenance

 

This equipment should be maintained according to general equipment maintenance management system, lubrication and operating conditions should be checked regularly, poor lubrication state or worn sealing elements must be treated timely to ensure the equipment in normal operating state.

 

In addition, in order to maximize the equipment value, regular patrol inspection or point inspection should be performed for the air lock device, hidden troubles that might influence the life ofair lockmust be eliminated.

 

VI. Common fault phenomena, cause and remedies, see the table

 

 Fault phenomena

 Cause

 Remedies

 

No discharge

  1.  Seal plate is worn, clearance exists between it and the housing.
  2. Motor fails
  3. Due to the installation of air network
  4. Drive cam bearing is broken

1,

  • Adjust the clearance or make replacement;
  • Adjust the length of joint bearing;
  • Adjust the length of chain.

2. Check electric wiring and motor status.

3. The reason of air network, adjust the air network.

4. Replace the bearing.

 

Material offset

Caused by the characteristic and installation form of the air network

Loosen the hopper adjusting screw, adjust the hopper, reduce the angle between the hopper axis and the channel with more materials, after adjustment is made with materials, fasten the hopper seal nuts.

 Large drive noise

Poor lubrication

 Level 3 maintenance

 Ash lekage at the inlet/outlet flange

 Good packing seal is not provided for the flange

 Packing seal

Live housing

 Housing is not grounded, or zero circuit is connected in series

 Repair the line, make grounding.

High motor temperature

 Motor housing is dusty

 Clean the dust

 Motor twists

 Fixing bolt is loose

 

 Fasten it

 

 

 

 

See Running video: https://youtu.be/Vw_YMgNkB0E

 

 

 

 

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now