Factory price honey extractor/Honey processing machine for sale
USD $3,000 - $6,000 /Piece
Min.Order:1 Piece
Factory price honey extractor/Honey processing machine for sale
Our honey concentrator includes of pre-heating
pot, filter, concentrator, seperators. condenser, vacuum pump etc.
2.It has advanced inside and outside cover and honey recycle pipe which material is SS304.
3.Process :
Pre-heating and mixing ------filtering -----condensing and get the finished honey.
Parameter:
Model | WT-50 | WT-100 | WT-200 | WT-300 |
Capacity (kg/h) | 50 | 100 | 200 | 300 |
Pump power(kw) | 0.75 | 1.1 | 2.2 | 2.2 |
Heating power(kw) | 8 | 15 | 24 | 36 |
Mixing power:(kw) |
| 0.55 | 0.55 | 0.75 |
Concentrating Temperature(℃) | 50℃ | |||
Degree of Vacuum(Mpa) | 0.092 | |||
Volume of Pre-heating pot(L) | 50 | 100 | 200 | 300 |
Volume of Concentrating pot(L) | 50 | 100 | 200 | 300 |
Dimension(m) | 1.8*0.6*1.7 | 2*0.7*1.9 | 3.2*1*2.2 | 3.5*1*2.4 |
Weight (KG) | 150 | 200 | 240 | 270 |
Delivery time: Within 5-7 days after receiving clients' payment
Payment Terms:T/T L/C Western Union D/P D/A Escow Paypal
yer machine
Packing: wooden box free of fumigation for High efficiency hot wind cycle drying oven hot air drur Quality guarantee term is for one year, Malfunctions which are caused by operation mistakenly will be responsible for customers
1 Quality guarantee
2 Pre-Testing before forwarding
3 Operation Video and instruction
4 Full Technical service
1 Manufacturer for honey production equipment line
2 Alibaba Assessed Gold Supplier
3 100% Quality control before forwarding
4 Competitive price withe best quality and service
Are you manufacturer ?
Yes we are the manufacturer and welcome to visit our factory
2 Can you change the machine voltage as our request?
Yes we can change the machine voltage as customers’ request
3 How about your after-sale service?
Our engineer can go outside to install and train your workers to operate the full machine line.
4 Warranty time of your machine?
1 years warranty time except for consumable spare parts
5 How about delivery time of your machine?
Generally it needs 5-7 days, for big machines or producing line, it will be much longer but within our negotiated delivery time