Product Details

Gold mining dredger

Brand Name HighLing dredger
Place of Origin Shandong, China
Model Number HLC-T150
Type Bucket Dredger, Bucket dredger
Certification SGS
After-sales Service Provided Engineers available to service machinery overseas
Warranty One year
Dimension(L*W*H) 40x6.6x1.2m
Power Type Diesel
Condition New
Draught 80 cm
Dredging Depth 19 m

Product Features

 Weifang Hailing dredger co.Ltd

 1.     Located in Weifang City,Shandong

 2.     9 workshops

 3.    One office building for sales department

 4.     Established in 2011,expansion for mass production compare to Haiyang

 5.     Dredger producting ,assemble,testing and dismantle for shiping center.

 6.     15000 square meter for workers recreation

 7.     Testing center for 8mdepth

 8.     Near to Weifang Port

1. The introduction of our products:

It is a kind of gold mining equipment, dismantles type with hydraulic operation system, can be put into container and assemble at working site. The main hulls are made up of three pontoons, which can be assembled to complete when working. The controlling room is also dismountable, which can be dismantling when passing through bridges. Especially when it is in unconnected water areas, the hull can be dismounted and transported by cars or trains. The driving devices are also use lubes oil and sealed-in units. 

 

 

We can also design and produce special types of machinery according to customers’ requirements.

 

2. Product images for your references

 

products images:   

 

 Gold mining dredger

The specification list for your reference:

 

 

Name

 

HLC1000 hydraulic cutter suction dredger

 

Type

 

Bucket dredger

 

Dimensions

 

Single Pontoon size

 

Length* width* depth 40*6.6*1.2m

 

Structure

  

Can be dismantle and assemble at working site

 

Max. dredging depth

 

15m

 

Discharge distance

 

200m

 

Working capacity

 

200m3/h

 

Main engine power

 

75kw

 

Auxiliary engine power              

 

15kw

 

Max. oil consumption

 

40kg/h

 

Other products:

 

 Gold mining dredger

workshop images:

 

Gold mining dredger

Weifang Hailingdredger Co.,Ltd

 

1.     Blanking workshop

2.     Gold panning machinery processing workshop

3.     Machining workshop

4.     Anti-corrosion workshop

5.     General assembly workshop

6.     Testing center before ex-factory

7.     Painting workshop

8.     Dismantle workshop

 

Spares:

Gold mining dredger

 

Gold mining dredger

 

The dredge pump is driven by the main diesel engine through the gear down box.

 

The alternator driven by the auxiliary diesel engine supplies the electricity for the whole ship power and lighting.

 

The genet supplies the electricity for lighting and emergency use when the ship stops.

 

The cutter (bucket wheel) is dirven by hydraulic motor, the cutter(bucket wheel) bear has lubrication seal device.

 

The dredger is moved by the alternate swing of the spuds. The spuds is lifted by the hydraulic cylinder.

 

The shifting winch,cutter(bucket wheel) ladder lifting winches fixed on the ship are driven by the hydraulic motor.

 

The hydraulic pump is driven by the auxiliary diesel engine.

 

The design,building and inspection are in according to the standard requirements of CCS.

 

Our company and testing pools:

 

Gold mining dredger

 

Gold mining dredger

 

Transportation:

Gold mining dredger

 

 Gold mining dredger

 

 Shipping to the Tianjin Port.

Our dredger will be dismantle for different parts and then shipping to the port. The dismantle structrue is convenient for transport in the working process if in different working sites.

 

Customers' visiting:

Gold mining dredger

 

Gold mining dredger

Note

 

All necessory tools, tackles, plants and machineries required for the installation, testing and commissioning of silt dredging equipment shall be in the scope of the buyer.

 

It is the responsibility of the buyer to store of the material at appropriate locations at their own cost if required. However, storage site shall be provided by the buyer.

 

Installation

 

Responsibility for the seller

 

The seller shall provide technical personnel who are skilled and experienced in their respective callings and help installation for the work at hand.

 

Engineers for helping installation and debugging

 

The seller shall provide two engineers on the site in the execution of the training works for skilled, semi-skilled and unskilled workers of the buyer

 

 The buyer shall be responsible for the recruitment, transportation, accommodation, and medical care and catering of all labor, local or expatriate, and for all payments in connection therewith. 

 

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now