Long beam trailer( 3 axles) Quality Oversize Object Transport Hydraulic Towing Dolly Girder/ Beam Carrier for Bridge Construction
USD $10000 - $60000 /Unit
Min.Order:1 Unit
Description of for Precast beam carrier/ concrete Girder Carrier /Bridge Girder Transporter sale
Item | Specs | Remark | ||
1 | Model | / | FSC80T | The steering can be locked according demand |
2 | Power of engine | / | RS190H,7.0KW(10HP) | |
3 | Axle | / | 3 axles | |
4 | Payload | T | ≤80 | |
5 | Suspension | / | Spring suspension | 3 per trailer |
6 | Body dimentsions (L×W×H) | m | 5.3×2.8×1.5 | |
7 | Tyre | / | standard | |
8 | Tyre model | / | 1200R20 | Steel tire |
9 | Brake | / | Air brake | Stop air brake (can be option) |
10 | Climbing ability (cross slope) | / | 3% within | Heavy duty |
11 | Climbing ability (longitudinal slope) cross slope | / | 3%~7% | Heavy duty |
12 | Curb weight | Around 6.5T | ||
Remarks: If the carrier is hauled by tractor head, we can customize the hook according to your needs. You need to provide the detailed size of the tractor and the position of the fulcrum. |
At present, in the process of road and bridge construction, because the production and design of bridges can not be in one place, there is a certain distance between bridge erection and prefabricated beam yard. Bridge transportation is a major problem to be solved by construction units.
The present most commonly used modes of transportation are motor-type rail beam transport flat car and box girder carrier, but these two modes of transportation can not fully meet the actual needs of beam transport.
The prefabricated beam of highway has a large weight and volume, generally at 80T-200T.
Although the gravity center of the electric rail beam transport flat car is low, the operation is relatively stable, and the beam erection process can be completed at the same time. Feeding beams, but the whole journey needs to lay tracks and lines, for long-distance (more than 1 km) bridge transportation, the cost of track laying is too high.
While the box girder carrier can satisfy long-distance beam transportation, but can not complete the process of beam feeding, after the box girder carrier transports beams to the bridge erection position, it needs to add a pair of beam-shifting portal frames, from beam-shifting portal frame to electric track. After the flat car, the beam can be fed.
The load of the box girder carrier on the market is about 100 tons, which can not meet the needs at all. The large-tonnage tire box girder carrier developed and manufactured by our company can solve the problem of long-distance and large-tonnage safe transportation of prefabricated components, and can complete the beam feeding process step by step.