GFM8-2 Automatic fire extinguisher powder filler

GFM8-2 Automatic fire extinguisher powder filler

Negotiable /Piece

Min.Order:1 Piece

Supply Ability:
1000 Piece / Pieces per Month
Port:
Tianjin
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal Cash Escrow Other

Quick Details View All >

Brand Name:
hongyuan
Place of Origin:
China
Model Number:
GFM8-2
Certification:
CE,ISO9001
After-sales Service Provided:
Engineers available to service machinery overseas
Weight:
200kg

HEBEI RAOYANG HONGYUAN MACHINERY CO.,LTD.

Business license
Business Type: Manufacturer
Hengshui Hebei China
Main Products: Fire extinguisher filling equipment ,Electric pressure test pump

Product Details

Filling precision

1kg+0.02

Filling speed

6-12kg/min

Voltage

AC380V&AC220V 50Hz

Power

0.55KW&1.5KW

Weight

200kg

Volume

length x width x height 1130x520x1350mm

Detailed explanation of the operation method of dry powder filling machine

1. Preparation work

1.Cleaning: Before operation, the dry powder canning machine should be cleaned to ensure the hygiene and safety of the equipment.

2.Inspection: Check whether all parts of the equipment are intact, whether there are abnormal conditions such as loosening.

3.Prepare raw materials: The dry powder raw materials to be used are fully prepared, and ensure that the raw materials are clean and free of impurities.

2. Boot operation

1.Turn on the power supply: Turn on the power supply of the dry powder canning machine and turn on the main power switch.

2.Set parameters: According to the needs, set the parameters of the dry powder filling machine, including weighing data, combination data, filling speed, etc.

3.Turn on the manipulator: Turn on the manipulator and send the empty tank to the work area for filling.

Three, the operation steps

1.Add raw materials: Put the prepared dry powder raw materials into the hopper.

2.Turn on the vibrator: Turn on the vibrator to ensure the smooth flow of dry powder raw materials.

3.Start filling: Through the set parameters, start the filling process and fill the dry powder into the empty tank.

4.Check the sealing: When the filling of the jar is completed, check the sealing of the jar and whether the filling amount is normal.

5.Complete the operation: When the filling work is completed, turn off the power of the equipment, clean the equipment and save it.

Fourth, precautions

1.The equipment must be inspected and cleaned before operation to ensure the safety and hygiene of the equipment.

2.When setting the parameters, it should be adjusted according to the type of material to be filled and the packaging specifications.

3.Pay attention to maintaining the normal operation of the dry powder filling machine, and carry out regular maintenance and maintenance.

4.When a fault is found, stop in time and contact the maintenance personnel to deal with it.

[Summary] This article introduces in detail the operation method of the dry powder canning machine, including preparation work, start-up operation, setting parameters, operating steps and precautions.The rational use of dry powder canning machines can improve packaging efficiency and quality, reduce production costs and labor workload.


Contact Supplier

Mr. shijie general manager Chat Now
Mobile
86-13273308303
Address
raoyang Hengshui,Hebei

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Packaging Machine > Filling Machines
Categories
Hi~