Cost-Saving Infiltration Chamber for rainwater Resource Recovery
Cost-Saving Infiltration Chamber for rainwater Resource Recovery
Cost-Saving Infiltration Chamber for rainwater Resource Recovery

Cost-Saving Infiltration Chamber for rainwater Resource Recovery

Negotiable /Piece

Min.Order:100 Pieces

Supply Ability:
300 Piece / Pieces per Month
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal Cash Escrow Other

Henan Greeenland Tech Industrial Co., Ltd

Business license
Business Type: Distributor/Wholesaler
Main Products: single gas detector ,multi gas detector

Product Details

Technical Data:

Material

PP

Load Capacity

20KN/M²

Color

Black

permeability

20%

size(mm)

1150×800×510

temperature 

-30℃---120℃

Feature:

Durability

Excellent Sealing

Uniform Settlement
Smooth Flow
Easy Installation

Versatile Application

Advantages:
1、Resource Conservation: Uses polymer resin instead of traditional red brick and cement, reducing energy and land consumption, and preserving clay resources.
2、Environmental Protection & Efficient Drainage: Flexible connections ensure tight seals, preventing leaks and groundwater pollution. Smooth interior enhances drainage efficiency.
3、Easy Transport & Installation: Separable well components facilitate on-site assembly, saving costs and time (1/10th of traditional wells' construction cycle).
4、Durability: Polymer material's resistance to aging and unique reinforcing design prolongs lifespan and prevents uneven settlement.
5、Leak Prevention: One-time molding and adaptable connections ensure resilience against settlement and material expansion, preventing leaks.
6、Versatility: Adjustable height and customizable holes allow for insertion of various pipe materials, meeting all engineering needs.
7、Excellent economic performance: low overall cost, can be recycled, the project cost is lower than the reinforced concrete wells more than 1/3.

Application:

1、applicable to the scope of the building community (residential areas, public building areas, factories, etc.) within the buried depth of not more than 6m, not down the well operation of the plastic drainage check well project design, construction and maintenance.
2、general soil, soft soil, permanent frozen soil, seasonal frozen soil, expansive soil and humid loess soil conditions under the construction of plastic drainage check wells.
3、Areas where the seismic cracking degree is 9 and below.

4、The ground load of the general lane of the cell well is designed according to the total weight of the car 15t (rear wheel pressure 5t); the ground load of the fire lane is designed according to the total weight of the car 30t (rear wheel pressure 6t).


Company Advantages:
1、Supply Experience: Leveraging decades of industry supply experience, we ensure seamless delivery of high-quality rainwater harvesting and stormwater management solutions.
2、Technical Team: Our dedicated technical team of skilled engineers and technicians drive innovation, designing and manufacturing cutting-edge modular water storage systems tailored to your needs.
3、Certificates & Quality Assurance: Holding international certifications and maintaining rigorous quality control standards, we guarantee products that exceed industry expectations for safety, durability, and performance.
4、15 Years Export Experience & Service: With over 15 years of successful exports and unwavering commitment to customer service, we provide exceptional support and solutions to clients across the globe.


Contact Supplier

Ms. Skylar Shi Chat Now
Mobile
86-13838155309

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Construction & Real Estate > Plastic Building Materials > Other Plastic Building Materials
Categories
Hi~