Modern design 200L milk cooling tank price
Negotiable
Min.Order:1
Shanghai Genyond Technology Co., Ltd.
Description of Milk processing line
This Milk processing line produce several types of market milk products, i.e. whole milk, skimmed milk and standardized milk of various fat contents.
This Milk processing line raw milk can be fresh milk or powder milk, the procedure method can be pasteurization or HTST pasteurizer or UHT processing.
End product package of this Milk processing line can be plastic pouches, plastic cups, plastic bottles, glass bottles, roof top box, pre-pak pouches , Tetra pak etc. for this Milk processing line according to different end product and package type, the production technology is differently designed, but commonly include the following steps:
Milk Reception → Pasteurization → Homogenization → Yogurt making →Milk Storage → Packing → Refrigeration → Hot water generator → Laboratory → Install and commissioning.
As a professional milk and juice production line supplier, we can design,
manufacture, install milk production line and milk plant for producing all kinds of dairy products, such as pure milk, flavored milk, sour milk, yogurt, milk drinking and ice cream, butter, soy milk, tea drinking, energy drinking and so on.The whole milk production line includes the following units:
1. Milk reception or powder & water mixing unit.
This part is to prepare and mix the raw material. If the fresh milk is in urgent need or not enough for production, powder milk can be used to replace it.
2. Mixing and sugar melting unit.
Mixing machine and heat system are needed to melt the sugar and supply hot water, and then before entering the mixing tank (blending tank) for further mixing, the syrup should be cooled.
3. Pasteurizer and homogenizer.
This part is to kill the bacteria, thus ensuring the safety of products.
The homogenizer is used to make the products more homogeneous which can help to improve the quality and prolong the shelf life of products.
The degasser is used to remove the air that is mixed in the product. According to different products types and filling types, the pasteurizer is strictly chosen to suit the plant.
4. Storage or yogurt producing unit.
5. Filling or packing unit.
We can provide many kinds of filling types, such as plastic bag, PRT bottle, HDPE bottle, glass bottle, gable bottle, and plastic cups and so on. You can choose what you want.
6. CIP cleaning system.
7. After treatment equipments such as conveyer, package or pallet etc.
8. Some assistant equipments like steam boiler, air compressor and cold water unit etc.
9. Materials for the product pipes installation, power pipes installation and
also electrical installation.
Material | SUS304 |
Product Keywords | 200L milk cooling tank price |
milk process line, dairy process machine
Capacity of plant: 2Ton-300Ton Per Day.
Products type: 1 or 2 or more kinds.
milk process line, dairy process machine
1. Milk Reception or Powder Dissolving Mixing Section
2. Mixing and Sugar Melting Section
3. Pasteurizer and Homogenizer
4. Milk Storage or Yogurt Producing Unit
5. Filling or Packing Unit
6. CIP Cleaning Systems
7. After Treatment Equipment, like conveyor, package or pallet, etc.
8. There are other assistant equipments used such as steam boilers, air compressor, cold water unit, etc.
9. Installation materials for the material pipeline, non-material pipeline as well as electrical installation are provided
Filling types can be decided by the customer then designed accordingly.Capacity of plant: 2Ton-300Ton Per Day.
Products type: 1 or 2 or more kinds.
Filling types can be decided by the customer then designed accordingly.
Our company can design customized production lines in accordance to the customers' requirements.
We are a major milk beverage, yogurt production line manufacturer based in China. We are approved by ISO9001:2008.
We provide :
1. Professional technical design , flow chart, factory layout, equipment drawing design, civil engineering suggestion etc. technical support
2. Manufacturing whole production line equipment
3. Delivery equipment, arrange engineer go to client workshop installation and commissioning
4. Training client's operators to runing each equipment, until end product comes out
Standard export carton packing.
3-40 days after confirming order,detail delivery date should be decided according to
production season and order quantity.