Customized commercial peanut butter making machine
Negotiable
Min.Order:1
Shanghai Genyond Technology Co., Ltd.
Material | SUS304 |
Product Keywords | commercial peanut butter making machine |
Application:
This process line can produce stable peanut butter, particle peanut butter and common type of peanut butter. Also produce a stable and common type of sesame.
The unit equipment has high mechanization level,high reliability,and it is fully sealed.
Technological process:
Elevator--Roasting---Cooling--Peeling--Selecting--Milling--Mixing--Cooling--de-gassing--Liquid filling machine
No. Item Spec. Qty.
1 Feeder 1
2 Hoist 1
3 Continuous baking machine 1
4 Hoist 1
5 Continuous cooling machine 1
6 Peeling machine for half 1
7 Screening belt 1
8 Hoist 1
9 store material feeding machine 1
10 Butter grinding machine 1
11 Storage tank 1
12 Paste pump 1
13 Mixing tank 1
14 Vacuum degassing tank 1
15 Paste pump 1
16 Control cabinet 1
17 Pipeline 1
Roasting: Batch roaster’s working temperature is 200-210 ºC, 20-30 minutes. Use batch roaster will bake some delicious smells.
Cooling: Peanut will be send cooling belt to cool.
Peeling: Put the roasted peanuts into peeler to take off the red skin, the double rollers will frication the red skin, the simple cyclone system will suck the red skins, most of them will be put in half-piece, then fall to the selecting conveyor, the over-roasted andun-blanched peanut kernel is picked up by manual or mechanical.
Primary grinding: Using steel grinder to make the first grinding.
Second grinding: Using colloid grinder to make the second grinding, the fineness of grinding is controlled below 7μm, temperature of grinding is controlled below 68C.
Mixing: Make the butter more homogeneous.
Cooling: The butter through second grinding should be cooled immediately. The temperature should go down 45C.
Degasser:Take out the air from peanut butter.
Storage tank: Settling down in the storage tank till the temperature drop to air temperature.
Packing: By the filling machine, the finished peanut butter is packed into 200g/500g/1000g bottle.
Standard export carton packing.
3-40 days after confirming order,detail delivery date should be decided according to
production season and order quantity.