reliable quality best price js750 twin shaft concrete mixer with lifting bucket
USD $6000 - $10000 /Piece
Min.Order:1 Piece
Yili Engineering Machinery Henan Co., Ltd.
china twin shaft concrete mixer electric cement concrete mixer plant
china popular commercial twin shafts mixer concrete batching plant
excellent quality 1m3 concrete mixer hot sale universal cement mixing in china
china hot sale good price js1000 rotating cement concrete mixer factory machinery
good price 1m3 concrete mixer js1000 in concrete plant from famous factory
new design stationary electric 1m3 concrete mixer in concrete batching plant
Products Introduction
Yili JS series twin shaft concrete mixer is very hot to be used for concrete batching plant. It has a very good mixing effect of the finished concrete with its compulsory mixing feature. Twin shafts also provide a high efficiency mixing, which can save your time.
Product Paramenters
Model | JS500 | JS750 | JS1000 | JS1500 | JS2000 | JS3000 |
Feeding/Discharging | 800/500L | 1200/750L | 1600/1000L | 2400/1500L | 3200/2000L | 4800/3000L |
Theo. Mixing Capacity | 25m3/h | 35m3/h | 50m3/h | 75m3/h | 120m3/h | 180m3/h |
Max. Aggregates Szie | 60mm | 80mm | 80mm | 80mm | 80mm | 100mm |
Mixing Blades | 6pcs*2 | 7pcs*2 | 8pcs*2 | 9pcs*2 | 9pcs*2 | 10pcs*2 |
Shaft Rotating Speed | 35r/min | 31r/min | 25.5r/min | 25.5r/min | 23r/min | 24.3r/min |
Mixing Motor | 18.5kw | 30kw | 18.5kw*2 | 22kw*2 | 45kw*2 | 55kw*2 |
Winch for Skip Hopper | 5.5kw | 7.5kw | 11kw | 18.5kw | 22kw or belt | / |
Winch Lifting Speed | 18m/min | 18m/min | 21.9m/min | 23m/min | 26.8m/min | / |
Water Pump | 0.75kw | 1.1kw | 3kw | 3kw | 4kw | 4kw |
Product Details
Customer Photos
Manufacturing Technique
Delivery & Project
Company Profile
We believe our products can meet your demands and we welcome friends all of the worlds to visit us!
FAQ
1. Are you the real manufacturer?
Yes, We Yili is a real factory with 20 years history.
2. What is the delivery time?
Depending on the machine size, averagely 10 days.
3. What is the warranty time?
1 years from the day when the goods arrive at your port, or 13 months after departing from China port.
4. Do you provide ODM or OEM?
We can design the plant according to your land layout and print your logo onto the machines.
5. Do you provide installation guide and operation training?
Yes, installation manual will be provided and we can send our engineer to your site.