Super Strength Badminton Racket String 0.72mm 200M Roll
6.25 - 6.45 /Piece
Min.Order:200 Pieces
NANTONG NTEC Monofilament Technology Co.,Ltd
HDPE Monofilament Yarn for Bath Towel 300D High Tenacity Monofilament Yarn
Square Trimmer Line .095 inch By Spool Packing Grass Cutting Line
100m Super Strong Nylon Transparent Outdoor Sea Fishing Line Nylon Monofilament Fishing Line
3.0mm polyester/PET wire 1000m Spool for Dragon Fruit Support Line
100% Polyester/PET 0.155mm Monofilament Yarn For Curtain Tapes Fabric
PET Monofilament Yarn 0.17mm 0.20mm 0.25mm Monofilament Yarn For Filter Cloth
Description:
- Professional badminton racket string replacement.
- Made of high quality nylon material, which is durable for long term use.
- With excellent elasticity and strength that can provide a great performance.
- Sharp feeling with diameter 0.72mm gauge, great repulsion for high clear and defensive shots.
- The 200 meter reel will allow you to string many rackets depending on usage and your stringing technique
Specification:
- Material: Nylon
- Length: 200Meter/656.17Feet
- Diameter: 0.72mm/0.03inch
Feature:
1. Small string diameter, offers high repulsion and wonderful hitting sounds.
2. Waving surface treatment ensures excellent control performance
3. Fast hitting speed
4. Nylon material with durability Use.
1.Our company has more than 10 years in this field, so that we can make sure the good quality of products.
2.We have our own factories and production equipments, so that we can promise a short lead time(10-25days).
3.We are the direct manufacturers, so that we will give you a reasonable price as far as possible.
4.We have been cooperated with many countries in the world, and we hope to estalish cooperation relations with more and more
countries in the world.
5.Of course, your business relationship with us will be confidential to any third party.
FAQ
Q1:Can we get the sample for reference?
A:Samples can be sent to you to check the quality by free,but you should pay for the express fee.
Q2: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to
quantity.
Q3: How can we guarantee quality?
A:Always a pre-production sample before mass production;
Always final Inspection before shipment