prefabricated factory two story building steel structure storage hangar
Negotiable
Min.Order:1
steel structure facility roof for hangar building with glass
construction steel structure warehouse structural steel aircraft hangar
construction steel bracing steel frame warehouse hangar steel structure warehouse
multi-storey steel warehouse build steel structure hangar steel roof construction structures
prefabricated industrial shed construction prefab steel structure warehouse building hangar
industrial shed construction quick build warehouse hangar cover steel structure building
1. The tensile strength of steel is much more times greater than concrete.
2. Steel is also ductile in nature.
3. Steel has also the high strength to weight ratio as compared to concrete.
4. Steel structures are also preferred when time span is small. Construction rate is very fast.
5. Steel bars are also reusable.
6. Steel structures can be extended in any direction.
7. Steel has smaller columns as compared to concrete columns, so do to this more space will be available for some other functions.
8. As steel structures are lighter then concrete, therefore there is less cost used and foundation of structure become less expensive.
9. Steel structures are cost-effective
Steel Framework(Q235B,Q355B) |
1.steel beam |
Wall and Roof |
1.single steel sheet 0.2mm-0.8mm thick |
Door |
1.rolling door |
Window |
1.sliding window |
Gutter |
1.aluminum-zinc steel sheet |
Downpipe |
1.pvc |
Ventilation |
1.turbine vent |
Other Materials |
self-screwing tapping,bolt,nut ,foundation bolt ,pulling rivet etc. |
1. You are manufacture factory or trading company?
We are a factory. You are welcomed to visit us at any time.
The quality control flow and sales team will show you our professionalism. Also you will can get best and most competitive price
after visiting us.
2. Is your price competitive compared with other companies?
Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything
we can to reduce your cost and guarantee you get the best product that you paid for.
3. Can you send engineers or whole team to install my project?
We will give detailed installation drawings for free. We can send engineers as installation director or a team upon request.
4. Do you accept container loading inspection?
You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
5. Do you offer designing service for us?
Yes, we offer full set of drawing as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and
etc. we can design complex industrial building like office mansion, super marker, auto dealer shop, shipping mall, 5 star hotel.
6. What is the lead time?
Lead time depends on order quantities. In general the delivery time to nearest seaport in China will be 40 days after receiving
deposit.
7. How can you get a quotation for your projects?
You can contact us by email, phone, Alibaba TM, WhatsApp, Skype, Viber and so on 24*7 and you will get reply within 8 hours.