Best selling structural metal building materials two story multi-story steel structure warehouse building prefabricated
Negotiable
Min.Order:1
Hebei Weizhengheng Construction Engineering Co., Ltd.
Some main project exporting | ||||||
Projects Name | Dimensions | Located | Amount(FOB Tianjin Port) | |||
Warehouse for machines storage | 50m*100m*8m-Double Floors | USA | USD 185,050.00 | |||
Horse Barn | 20m*50m | Australia | USD 41,000.00 | |||
Carport | 33m*12m | Russia | USD 21,320.64 | |||
Storage Warehouse | 35m*15m*10m-Double Floors | Swiss | USD 30,450.87 | |||
Storage Warehouse | 3500m2 | Mongolia | USD 301,000.00 | |||
Steel Structure School | 4 Story | Haiti | USD 500,258.87 | |||
Office | 50m*20m | Bangladesh | USD 134,000.82 | |||
Warehouse | 2000m2*8m | Dubai | USD 92,883.65 | |||
Warehouse | 800m2 | Tanzania | USD 54,400.72 | |||
Office | 1080m2 | France | USD 135,788.06 | |||
Guard Building | 300m2 | Algeria | USD 29,600.65 | |||
Workshop | 500m2 | Ghana | USD 43,980.00 | |||
Warehouse | 1000m2 | Thailand | USD 156,448.75 | |||
In order to supply the most suitable drawing and best price for you, our design team need to confirm some information with you, as below:
1 Location (where will it be built? ) _____country, city_____
2 Size: Length*width*height _____mm*_____mm*_____mm
3 Wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
4 Snow load (max. Snow thickness)_____kn/m2, _____mm
5 Anti-earthquake grade_____
6 Brick wall needed or not. If yes, 1.2m high or 1.5m high?
7 Thermal insulation requirement. If yes, EPS/fiberglass wool/rock wool/PU sandwich panels will be suggested; If not, the metal steel sheets will be OK. The cost of the latter will be much lower than the former.
8 Door quantity & size _____units, _____(width)mm*_____(height)mm
9 Window quantity & size _____units, _____(width)mm*_____(height)mm
10 Crane needed or not. If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m
Painting Choose | ||
Buttom Paint | Epoxy mica middle paint, inorganic zinc rich middle paint, high chlorinated polyethylene middle paint, epoxy coal tar middle paint | |
Middle Paint | Epoxy mica middle paint, inorganic zinc rich middle paint, high chlorinated polyethylene middle paint, epoxy coal tar middle paint | |
Face Paint | Alkyd enamel, polyurethane topcoat, acrylic polyurethane paint, inorganic zinc-rich topcoat, fluorocarbon topcoat, high chlorinated polyethylene topcoat, epoxy coal tar topcoat, silicone high temperature resistant topcoat, acrylic polyurethane metal paint, Fluorocarbon metallic paint, epoxy top coat |
We are manufacture factory. And you are welcomed to visit us at any time. The quality control flow and sales team will show you our professionalism. Also you will can get best and most competitive price after visiting us.
2. Is your price competitive compared with other companies?
Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.
3. Can you send engineers or whole team to install my project?
We will give detailed installation drawings and video for free. We can send engineers as installation director or a team upon request.
4. Do you accept container loading inspection?
You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
5. Do you offer designing service for us?
Yes, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. we can design complex industrial building like office mansion, super marker, auto dealer shop, shipping mall, 5 star hotel.
6. What is the delivery time?
Delivery time depends on order quantities. In general the delivery time to nearest seaport in China will be 30 days after receiving deposit.
7. How can you get a quotation for your projects?
You can contact us by email, phone, Alibaba TM, WhatsApp, Skype, Viber and so on 24*7 and you will get reply within 8 hours.